{"id":32431,"date":"2025-09-05T09:00:00","date_gmt":"2025-09-05T13:00:00","guid":{"rendered":"https:\/\/www.sage.com\/en-us\/blog\/?p=32431"},"modified":"2026-09-25T11:32:42","modified_gmt":"2026-09-25T15:32:42","slug":"estimating-construction-costs","status":"publish","type":"post","link":"https:\/\/www.sage.com\/en-us\/blog\/estimating-construction-costs\/","title":{"rendered":"How to estimate construction costs: A step-by-step guide for winning bids"},"content":{"rendered":"<header class=\"entry-header has-dark-background-color entry-header--standard\">\n\t<div class=\"container\">\n\t\t<div class=\"entry-header__row row align-center\">\n\t\t\t<div class=\"col col-lg-7 col-xlg-6 entry-header__content\">\n\t\t\t\t\t\t\t<div class=\"component component-single-header\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"entry-header__misc text--subtitle text--uppercase text--small\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/category\/construction\/\" class=\"entry-header__link\">Construction<\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t<div class=\"entry-title-wrapper\">\n\t\t\t\t\t<h1 class=\"entry-title\">\n\t\t\t\t\t\tHow to estimate construction costs: A step-by-step guide for winning bids\t\t\t\t\t<\/h1>\n\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t<p class=\"entry-header__description\">\n\t\t\t\t\t\tA reliable construction cost estimate keeps your bids competitive and your margins protected. Here&#8217;s how experienced contractors turn project details into a defensible number.\t\t\t\t\t<\/p>\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<div class=\"col col-8 col-lg-4 entry-header__image\">\n\t\t\t<figure class=\"entry-header__thumbnail js-hero-section\">\n\t\t\t\t<img decoding=\"async\" width=\"1214\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0683-1214x810.jpeg\" class=\"entry-header__thumbnail-image\" alt=\"\" fetchpriority=\"high\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0683-1214x810.jpeg 1214w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0683-768x512.jpeg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0683.jpeg 1280w\" sizes=\"(max-width: 1214px) 100vw, 1214px\" \/>\t\t\t<\/figure>\n\t\t<\/div>\n\t\t\t\t<\/div>\n\t<\/div>\n\t\t<div class=\"single-post-details container\">\n\t\t<div class=\"col\">\n\t\t\t<span class=\"posted-on \">Published <time class=\"entry-date published\" datetime=\"2025-09-05T09:00:00-04:00\">September 5, 2025<\/time><\/span><span class=\"reading-time\"> min read<\/span>\n\t\t<button\n\t\t\ttype=\"button\"\n\t\t\tclass=\"social-share-button button button--icon button--secondary js-social-share-button\"\n\t\t\tdata-share-title=\"How to estimate construction costs: A step-by-step guide for winning bids\"\n\t\t\tdata-share-url=\"https:\/\/www.sage.com\/en-us\/blog\/estimating-construction-costs\/\"\n\t\t\tdata-share-text=\"Please read this interesting article\"\n\t\t>\n\t\t\t<span class=\"social-share-button__share-label\">Share<\/span>\n\t\t\t<span class=\"social-share-button__copy-label\" hidden>Copy Link<\/span>\n\t\t\t<span class=\"social-share-button__copy-tooltip\" aria-hidden=\"true\" hidden>Copied<\/span>\n\t\t<\/button>\n\n\t\t\t\t<\/div>\n\t<\/div>\n\t<\/header>\n\n\n\n<div class=\"wp-block-post-author has-dark-background-color alignfull\">\n\t<div class=\"container\">\n\t\t<div class=\"col\">\n\t\t\t\t\t\t\t<div class=\"co-authors\">\n\t\t\t\t\t\n\t\t<div class=\"entry-author-wrapper\">\n\t\t\t<a class=\"entry-author\" href=\"https:\/\/www.sage.com\/en-us\/blog\/author\/joechurchwoods\/\">\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"40\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/05\/Joe-Yard-2-crop-350x350.jpg\" class=\"entry-author__image\" alt=\"Joe Church Woods\" \/>\t\t\t\t<span class=\"entry-author__name\">Joe Church Woods<\/span>\n\t\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\n\t\t\n\t\t<div class=\"entry-author-wrapper\">\n\t\t\t<a class=\"entry-author\" href=\"https:\/\/www.sage.com\/en-us\/blog\/author\/lauraslingo\/\">\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"40\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/03\/laura-slingo-headshot-350x350.jpg\" class=\"entry-author__image\" alt=\"Laura Slingo\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/03\/laura-slingo-headshot-350x350.jpg 350w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/03\/laura-slingo-headshot.jpg 400w\" sizes=\"auto, (max-width: 40px) 100vw, 40px\" \/>\t\t\t\t<span class=\"entry-author__name\">Laura Slingo<\/span>\n\t\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/div>\n\n\n\n<section class=\"wp-block-sage-article-update\"><div class=\"sage-article-update__inner\"><p>This article was originally published on September 5, 2025 and has been refreshed and re-published with new content on September 25, 2026.<\/p><\/div><\/section>\n\n\n\n<p class=\"wp-block-paragraph\">Estimating construction costs can be a real balancing act. Get it right and you&#8217;ll win competitive bids without leaving money on the table. Get it wrong and even a full pipeline of work won&#8217;t protect your margins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you&#8217;re a General Contractor (GC), you\u2019re constantly working against two constraints: your bid has to be competitive enough to win the job and realistic enough to cover the true cost of delivering it. A dependable estimate does both, giving you a clear view of expected labor, materials, equipment, overhead, and other project costs before you commit to a price.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The level of detail in an estimate changes as a project develops, but the fundamentals stay the same: understand the scope, quantify the work, use current pricing, account for indirect costs and risk, and review your numbers carefully before you bid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this guide, you\u2019ll learn how construction cost estimates develop from early planning to final bid, how to calculate project costs step by step, and how to use your estimate to track costs and protect margin once work begins.<\/p>\n\n\n<section id=\"key-takeaways\" class=\"wp-block-sage-key-takeaways\"><div class=\"sage-key-takeaways__inner\"><h2 class=\"wp-block-heading has-h-3-font-size\">Key takeaways<\/h2>\n<ul class=\"wp-block-list\">\n<li>A dependable construction cost estimate helps you price work competitively while protecting cash flow and project margin.<\/li>\n\n\n\n<li>Estimates become more detailed as the project develops and more information becomes available.<\/li>\n\n\n\n<li>A strong construction estimating process covers scope review, quantity takeoffs, current pricing, indirect costs, risk, and estimate validation.<\/li>\n\n\n\n<li>Project size matters, but complexity and uncertainty can have just as much impact on the level of estimating detail required.<\/li>\n\n\n\n<li>The estimate remains useful after the bid, giving you a benchmark for comparing expected costs with actuals, approved changes, and emerging variances.<\/li>\n\n\n\n<li>Construction software can connect estimating with job costing and project financials, helping teams improve future estimates and spot cost issues earlier.<\/li>\n<\/ul>\n<\/div><\/section>\n\n\n<h2 id=\"h-here-s-what-we-ll-cover\" class=\"wp-block-heading\">Here&#8217;s what we&#8217;ll cover<\/h2>\n\n\n<?xml encoding=\"utf-8\" ?><div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\"><ul><li><a href=\"#h-what-is-construction-cost-estimating-and-why-does-it-matter-for-your-bids\" data-level=\"2\">What is construction cost estimating and why does it matter for your bids?<\/a><\/li><li><a href=\"#h-how-do-construction-cost-estimates-change-as-a-project-develops\" data-level=\"2\">How do construction cost estimates change as a project develops?<\/a><\/li><li><a href=\"#h-how-do-you-calculate-construction-project-costs\" data-level=\"2\">How do you calculate construction project costs?<\/a><\/li><li><a href=\"#h-what-makes-a-project-harder-to-estimate\" data-level=\"2\">What makes a project harder to estimate?<\/a><\/li><li><a href=\"#h-managing-your-estimate-after-the-bid\" data-level=\"2\">Managing your estimate after the bid<\/a><\/li><li><a href=\"#h-achieving-accurate-cost-estimates-with-construction-software\" data-level=\"2\">Achieving accurate cost estimates with construction software<\/a><\/li><li><a href=\"#h-frequently-asked-questions-about-estimating-construction-costs\" data-level=\"2\">Frequently asked questions about estimating construction costs<\/a><\/li><\/ul><\/div>\n\n\n\n<h2 id=\"h-what-is-construction-cost-estimating-and-why-does-it-matter-for-your-bids\" class=\"wp-block-heading\">What is construction cost estimating and why does it matter for your bids?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction cost estimating is the process of calculating what a project will cost to build, based on materials, labor, equipment, overhead, and other project-specific costs and risk.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A dependable estimate does more than help you win the job: it becomes your financial benchmark once construction starts, guiding procurement, subcontractor negotiations, <a href=\"https:\/\/www.sage.com\/en-us\/blog\/budget-forecasting\/\">budgeting<\/a>, and cash flow planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A strong estimate provides a range of benefits:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Risk assessment:<\/strong> estimating construction costs helps reduce financial uncertainty for owners, lenders, and sureties by giving them a clearer picture of the project\u2019s expected costs and risks.<\/li>\n\n\n\n<li><strong>Forecasting and cash flow:<\/strong> your estimate becomes the starting point of your project budgeting and <a href=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-cash-flow-forecasting\/\">cash flow planning<\/a>, helping you anticipate when costs are likely to occur and how much funding the job may require.<\/li>\n\n\n\n<li><strong>Profit protection:<\/strong> errors in your estimate cut directly into profits. A carefully prepared estimate can help you account for labor overruns, price changes, and other cost pressures before they erode your margin.<\/li>\n<\/ul>\n\n\n\n<h2 id=\"h-how-do-construction-cost-estimates-change-as-a-project-develops\" class=\"wp-block-heading\">How do construction cost estimates change as a project develops?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Project estimates are always a work in progress. Early on you&#8217;re working from limited information, so the number is necessarily broad. As the design firms up and more detail becomes available, the estimate sharpens\u2014until it becomes the itemized bid you present to the client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The <a href=\"https:\/\/aspenational.org\/\">American Society of Professional Estimators<\/a> (ASPE) classifies estimates into five levels of detail, which map closely to the stages of a project and are a useful way to think about how much precision to expect at each point:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Preliminary estimate (Rough Order of Magnitude, or ROM):<\/strong> an early, broad figure based on limited information, often drawn from similar past projects. Useful for judging whether a project is feasible, but not accurate enough to bid from.<\/li>\n\n\n\n<li><strong>Schematic design estimate:<\/strong> once early design decisions are in place, the estimate starts to reflect the specific project rather than a comparable one. Still high-level, but grounded in this building rather than a past one.<\/li>\n\n\n\n<li><strong>Design development estimate:<\/strong> as drawings become more defined, you can price specific quantities and materials. This is where the estimate begins to reflect real decisions about finishes and subcontractors rather than assumptions.<\/li>\n\n\n\n<li><strong>Construction documents estimate:<\/strong> based on final plans and specifications, this covers the full scope as designed. It&#8217;s the most complete internal view of cost you&#8217;ll have before work begins.<\/li>\n\n\n\n<li><strong>Bid estimate:<\/strong> the number you submit. It takes the construction documents estimate and turns it into a client-facing price.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Wherever a project sits on that scale, the underlying work is the same.<\/p>\n\n\n\n<div class=\"single-cta\">\n\t<div class=\"single-cta__positioner on-scroll-highlight__target\">\n\t\t<div class=\"single-cta__wrapper has-dark-background-color\">\n\t\t\t<div class=\"single-cta__content\">\n\t\t\t\t\t\t\t\t<h2 class=\"single-cta__title h3\">Learn how Sage Construction and Real Estate puts power into the hands of your people<\/h2>\n\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a\n\t\t\t\t\t\thref=\"https:\/\/www.sage.com\/en-us\/sage-construction\/customer-resources\/\"\n\t\t\t\t\t\tclass=\"single-cta__button button button--primary\"\n\t\t\t\t\t\t\t\t\t\t\t\t\tid=\"cta-id-19089\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\tdata-button-location=\"cta_box\"\n\t\t\t\t\t\t\t\t\t\t\t>Tell me more<\/a>\n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<img decoding=\"async\" width=\"1440\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/06\/GettyImages-140872290-1440x810.jpg\" class=\"single-cta__image\" alt=\"construction workers\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/06\/GettyImages-140872290-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 33vw, 100vw\" \/>\t\t\t<\/div>\n<\/div>\n\n\n\n<h2 id=\"h-how-do-you-calculate-construction-project-costs\" class=\"wp-block-heading\">How do you calculate construction project costs?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Calculating construction project costs starts with understanding the scope of work, then identifying, quantifying, and pricing everything needed to deliver it. You\u2019ll also need to account for indirect costs and project risk before reviewing the estimate and turning it into a final bid.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Analyze the bid package<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Start with a thorough review of the bid documents, including specifications, general conditions, drawings, and owner requirements. Look for scope gaps, unusual requirements, and other issues that could affect cost or execution.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Confirm all architectural drawings and specifications are included.<\/li>\n\n\n\n<li>Assess structural, mechanical, and electrical requirements.<\/li>\n\n\n\n<li>Flag any unique or non-standard materials needed.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">These documents guide the rest of the construction estimating process, helping you break the project into manageable scopes of work and identify what needs to be priced.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Visit the site when needed<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A site visit provides a firsthand look at conditions that may not be obvious from the drawings or specifications, such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Accessibility issues for heavy equipment.<\/li>\n\n\n\n<li>Soil or ground conditions that could affect work.<\/li>\n\n\n\n<li>Existing structures that may need modification or removal.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">While a site visit may not be possible or necessary for every project estimate, it can help you account for real-world conditions that could otherwise affect costs later.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Perform a material or quantity takeoff<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A material or quantity takeoff identifies the materials, components, and quantities required to complete the work, giving you the basis for pricing the project. Best practices include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Group similar materials using a repeatable, trade-by-trade method.<\/li>\n\n\n\n<li>Use takeoff software where it improves speed and accuracy.<\/li>\n\n\n\n<li>Work from the latest drawings and specifications.<\/li>\n\n\n\n<li>Apply appropriate waste allowances where needed, rather than simply rounding every quantity up.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Many GCs still rely on spreadsheets for this step, but errors or omissions in the takeoff can quickly flow through into the final estimate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction firm <a href=\"https:\/\/www.sage.com\/en-us\/success-stories\/t-k-rubke-and-co\/\">T.K. Rubke<\/a> avoided this outcome by adopting the <a href=\"https:\/\/www.sage.com\/en-us\/products\/sage-estimating\/\">Sage Estimating<\/a> solution, and was able to produce more competitive, better-supported bids that helped it stand out against other contractors.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4. Request pricing from suppliers, subcontractors, and vendors<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once you know what the project requires, gather current prices and quotes from suppliers, subcontractors, and vendors. Cost databases and historical project data can also help you benchmark your numbers, but they shouldn\u2019t replace project-specific pricing where that\u2019s available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For materials with volatile prices, check how long supplier quotes remain valid and whether price escalation terms apply. Also account for project-specific costs such as delivery, mobilization, permits, fees, and other requirements identified in the bid documents.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" id=\"h-\">5. Account for overhead, indirect costs, and insurance<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Direct costs aren\u2019t the whole cost of delivering a construction project. You also need to account for the indirect and overhead costs required to run both the job and the wider business.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Cost type<\/strong><\/th><th><strong>Examples<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Main office overhead<\/td><td>Office rent, administrative salaries, business software<\/td><\/tr><tr><td>Jobsite overhead<\/td><td>Site supervision, temporary facilities, equipment mobilization<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Tracking these costs against your original estimate as the project progresses is part of<a href=\"https:\/\/www.sage.com\/en-us\/blog\/how-to-manage-job-costs-construction\/\"> job costing<\/a> and can help you identify overruns before they seriously affect your margin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Insurance and bonding costs should also be included where they apply to the project. For example, a performance bond protects against failure to meet contractual performance obligations, while a payment bond protects eligible subcontractors and suppliers if they aren\u2019t paid.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Review and validate the estimate<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before you use the estimate to prepare a bid, check it carefully. Cross-reference quantities against the original takeoff, confirm pricing is current, and make sure each part of the scope has been accounted for.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A second set of eyes helps here. Many estimating teams have a senior estimator or project manager review the numbers before they go out, since a fresh perspective can catch gaps the original estimator may have missed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. Turn the estimate into a bid proposal<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once the estimate is validated, you can use it to prepare the final bid. That means bringing together your direct and indirect costs, appropriate contingency for identified uncertainty, and the profit you need to make the project worthwhile.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here&#8217;s a simplified example showing how those costs might build into a final bid:<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-data\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Line item<\/strong><\/th><th><strong>Amount<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Direct costs (materials, labor, equipment)<\/td><td>$500,000<\/td><\/tr><tr><td>Overhead (main office + jobsite)<\/td><td>$50,000<\/td><\/tr><tr><td>Contingency allowance (illustrative)<\/td><td>$30,000<\/td><\/tr><tr><td>Profit<\/td><td>$45,000<\/td><\/tr><\/tbody><tfoot><tr><td><strong>Final bid total<\/strong><\/td><td><strong>$625,000<\/strong><\/td><\/tr><\/tfoot><\/table><\/figure>\n\n\n\n<section class=\"wp-block-sage-container is-constrained\"><div class=\"sage-container__inner\">\n<p class=\"wp-block-paragraph\"><em>This is only an illustrative example. The amount set aside for contingency should reflect the uncertainty and risk in the specific project rather than automatically applying a standard percentage.<\/em><\/p>\n<\/div><\/section>\n\n\n\n<h2 id=\"h-what-makes-a-project-harder-to-estimate\" class=\"wp-block-heading\">What makes a project harder to estimate?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Projects can cover a range of characteristics, from large and straightforward to small, customized initiatives that are difficult to price. In short, size, complexity, and uncertainty each play a role in pricing dynamics, but they don&#8217;t always move together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here\u2019s how the three variables affect planning:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Size<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Larger projects usually involve more trades, more resources, and more coordination across stakeholders, which adds to the estimating workload simply because there&#8217;s more to track. But a large project with repetitive structures and clear requirements can, in practice, be more straightforward to estimate than certain smaller jobs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Complexity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A smaller, highly specialized renovation with unique materials or advanced systems brings its own estimation challenges. What drives complexity is design intricacy and how much coordination the project needs. Estimating commercial construction costs for a straightforward retail build, for example, is often more predictable than pricing a smaller but highly technical renovation, since the retail build has fewer unknowns to price around even though it&#8217;s the larger job.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Uncertainty<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Building construction cost estimation for a well-documented job doesn&#8217;t carry the same risk as one with open questions still on the table. The less certain the scope, site conditions, or design intent are, the more detailed your takeoffs, pricing, and risk allowances need to be, and the more thorough your review before the estimate goes anywhere near a bid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you regularly bid on specialized work for sectors like engineering, pairing your estimating process with <a href=\"https:\/\/www.sage.com\/en-us\/industry\/services\/engineering-firms\/\">accounting software for engineering firms<\/a> can help you track technical scope changes without losing sight of the numbers.<\/p>\n\n\n\n<h2 id=\"h-managing-your-estimate-after-the-bid\" class=\"wp-block-heading\">Managing your estimate after the bid<strong><\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When you win a bid, that\u2019s not the last you see of your estimate. It requires constant checking because, as the job progresses, you can expect variances between what you priced and what actually happens on site.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Compare your original estimate against actual and committed costs<\/strong> on a regular basis, rather than waiting until the job wraps up. That turns your estimate into a live control estimate you can manage against, not just a historical bid document. <a href=\"https:\/\/www.sage.com\/en-us\/accounting-software\/project-costing\/\">Project cost management software<\/a> keeps the two side by side as costs land, saving you from reconciling spreadsheets after the fact.<\/li>\n\n\n\n<li><strong>Update your cost forecast every time a change order is approved<\/strong>, so your numbers always reflect the true remaining budget, not the one you started with.<\/li>\n\n\n\n<li><strong>Investigate material, labor, subcontractor, and scope variances as soon as they appear<\/strong>. Catching a cost drift early usually means you can still act on it\u2014renegotiate, adjust scope, or flag it to the client\u2014before it eats into margin.<\/li>\n\n\n\n<li><strong>Document change orders promptly<\/strong>, since scope changes that go unrecorded are one of the fastest ways to lose margin.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Keeping close tabs on <a href=\"https:\/\/www.sage.com\/en-us\/blog\/construction-project-cost-overruns\/\">construction overruns<\/a> as they happen, rather than after the fact, gives you the best chance of protecting your margin. Strong <a href=\"https:\/\/www.sage.com\/en-us\/blog\/how-proper-construction-project-management-saves-on-job-costs\/\">construction project management<\/a> practices make this kind of ongoing tracking far easier to sustain across a long build.<\/p>\n\n\n\n<h2 id=\"h-achieving-accurate-cost-estimates-with-construction-software\" class=\"wp-block-heading\">Achieving accurate cost estimates with construction software<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Construction estimating software takes over the manual work of building an estimate: automating calculations, generating cost breakdowns, and letting you model different scenarios as a project evolves. It also gives you a live link between your estimate and your actuals once the job starts, rather than treating the estimate as a one-off document.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For firms managing several projects at once,<a href=\"https:\/\/www.sage.com\/en-us\/sage-business-cloud\/intacct\/product-capabilities\/extended-capabilities\/project-accounting\/\">Sage Intacct project management accounting software<\/a> brings estimating, job costing, and financial reporting into one place, while <a href=\"https:\/\/www.sage.com\/en-us\/sage-business-cloud\/intacct\/product-capabilities\/extended-capabilities\/project-costing\/\">Sage Intacct project costing and billing<\/a> tools help you track costs and bill clients accurately as work progresses.<\/p>\n\n\n<section class=\"wp-block-sage-faq\">\n\t\n<h2 id=\"h-frequently-asked-questions-about-estimating-construction-costs\" class=\"wp-block-heading\">Frequently asked questions about estimating construction costs<\/h2>\n\t\t\t<div class=\"faq-items\">\n\t\t\t<div class=\"wp-block-sage-faq-item\" id=\"faq-item-3ee82c9f\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-what-should-a-construction-cost-estimate-include\" class=\"wp-block-heading\">What should a construction cost estimate include?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">A construction cost estimate typically includes direct costs such as labor, materials, equipment, and subcontractor work, alongside relevant indirect costs, overhead, and allowances for project-specific risk. The exact breakdown will depend on the project scope and the level of detail available.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-a60d0ca9\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-what-s-the-difference-between-a-cost-estimate-and-a-bid\" class=\"wp-block-heading\">What&#8217;s the difference between a cost estimate and a bid?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">A cost estimate is an internal calculation of what a project is expected to cost to build. A bid is the client-facing proposal based on that estimate, including the price you\u2019re prepared to deliver the work for. The estimate helps you understand the cost of the job; the bid is the amount you submit to the client.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-75805542\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-how-much-contingency-should-you-include-in-a-construction-estimate\" class=\"wp-block-heading\">How much contingency should you include in a construction estimate?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">There\u2019s no single contingency percentage that works for every construction project. The amount should reflect the level of uncertainty in the scope, design, pricing, schedule, and site conditions, with more uncertain or complex projects generally requiring a larger allowance.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-4f79262e\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-how-accurate-should-an-early-construction-estimate-be\" class=\"wp-block-heading\">How accurate should an early construction estimate be?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">Early construction estimates are generally less precise because they\u2019re based on limited project information. Accuracy should improve as the design and scope become more defined, but the expected range will vary depending on the project, estimate type, available data, and level of uncertainty.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-9f1e68db\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-what-s-the-most-common-mistake-in-construction-cost-estimating\" class=\"wp-block-heading\">What&#8217;s the most common mistake in construction cost estimating?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">Missing or underestimating indirect costs, such as overhead, insurance, and contingency, is one of the most common and costly mistakes. It&#8217;s also easy to base pricing on outdated unit costs instead of current supplier and subcontractor quotes.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-c30a62dd\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-what-software-helps-with-construction-cost-estimating\" class=\"wp-block-heading\">What software helps with construction cost estimating?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">Construction estimating software can help with quantity takeoffs, cost calculations, pricing, and detailed cost breakdowns. Connecting estimating software with job costing or project accounting tools can also make it easier to compare estimated costs with budgets and actuals once work starts. Sage Estimating supports detailed construction estimating and can connect with other Sage construction financial management tools.<\/p>\n\t\t<\/div>\n\t<\/div>\n\t\t<\/div>\n\t<\/section>\n\n\n\n<div class=\"single-cta\">\n\t<div class=\"single-cta__positioner on-scroll-highlight__target\">\n\t\t<div class=\"single-cta__wrapper has-dark-background-color\">\n\t\t\t<div class=\"single-cta__content\">\n\t\t\t\t\t\t\t\t<h2 class=\"single-cta__title h3\">Subscribe to our Sage Advice Newsletter<\/h2>\n\n\t\t\t\t\t\t\t\t\t<div class=\"single-cta__description\">\n\t\t\t\t\t\t<p>Get our latest business advice delivered directly to your inbox.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a\n\t\t\t\t\t\thref=\"#gate-ab515c6e-7e90-4c2f-a67e-113872516e8b\"\n\t\t\t\t\t\tclass=\"single-cta__button button button--primary\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>Subscribe<\/a>\n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<img decoding=\"async\" width=\"1440\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1073797282-1440x810.jpg\" class=\"single-cta__image\" alt=\"Working from home with tea in hand\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1073797282-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 33vw, 100vw\" \/>\t\t\t<\/div>\n<\/div>\n\n\n<section class=\"more-topics alignfull has-grey-light-background-color wp-block-sage-post-topics\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col col-12 col-lg-4\">\n\t\t\t\t<h3 class=\"more-topics__title h2\">Browse more topics from this article<\/h3>\n\t\t\t<\/div>\n\t\t\t<div class=\"col col-12 col-lg-8\">\n\t\t\t\t<ul class=\"post-tags__list\">\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/boss-your-business\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tBoss your business\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/business-continuity\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tBusiness Continuity\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/construction\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tConstruction\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/construction-financial-management\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tConstruction &#8211; financial management\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/construction-it\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tConstruction Technology\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/growing-a-business\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tGrowing a business\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/productivity\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tProductivity\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/small-business\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tSmall business\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/staying-competitive\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tStay competitive\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t<\/ul>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n<div class=\"alignfull wp-block-sage-related-posts\">\n\t<section class=\"related-posts card-grid has-dark-background-color\">\n\t<div class=\"container\">\n\t\t\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"col\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--featured h1\">Explore more wisdom<\/h2>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\n\t\t\t<div class=\"row related-posts__featured\">\n\t\t\t\t<div class=\"col card-grid__item\">\n\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-0 post-29442 post type-post status-publish format-standard has-post-thumbnail hentry category-money-matters category-strategy-legal-operations tag-accounting-101 tag-boss-your-business tag-business-strategy tag-cash-flow tag-staying-competitive business_type-accountants business_type-growing-business card-post--is-clickable\"\n>\n\t<div class=\"card-post__media-wrapper\">\n\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1440\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-147205362-1440x810.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-147205362-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-147205362-768x432.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-147205362-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"card-post__content\">\n\t\t\t\t\t<div class=\"card-post__label\">Recommended<\/div>\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-30T09:04:30-04:00\">September 30, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h3\">\n\t\t\t\t\t\t\t<a\n\t\t\t\t\tclass=\"card-post__title-link\"\n\t\t\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-accounts-payable\/\"\n\t\t\t\t>\n\t\t\t\n\t\t\tWhat is accounts payable? Definition, examples, and how it works\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/p>\n\n\t\t\n\t\t\t\t\t<p class=\"card-post__description\">\n\t\t\t\tLearn what accounts payable means, how AP is recorded, how it affects cash flow, and what to look for in accounts payable software.\t\t\t<\/p>\n\t\t\n\t\t\t<\/div>\n\n\t<\/article>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\n\t\t\t\t\t<div class=\"row related-posts__non-featured\">\n\t\t\t\t<div class=\"col col-12\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--more h4\">More on this Topic<\/h2>\n\t\t\t\t<\/div>\n\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-1 post-30322 post type-post status-publish format-standard has-post-thumbnail hentry category-accountants category-strategy-legal-operations tag-accountants tag-accounting-101 tag-boss-your-business tag-cash-flow tag-compliance tag-growing-a-business tag-sage-accounting tag-small-business tag-starting-a-business tag-staying-competitive tag-working-capital business_type-small-business business_type-accountants business_type-growing-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/accounts-payable-reconciliation\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Financial-Services_0640-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Financial-Services_0640-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Financial-Services_0640-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Financial-Services_0640-1214x810.jpg 1214w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-30T07:32:53-04:00\">September 30, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">12 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tThe ultimate guide to accounts payable reconciliation\u00a0\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-2 post-30327 post type-post status-publish format-standard has-post-thumbnail hentry category-accountants category-strategy-legal-operations tag-accounting-101 tag-boss-your-business tag-business-intelligence tag-cash-flow tag-compliance tag-growing-a-business tag-tax business_type-small-business business_type-accountants business_type-growing-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-a-deferred-tax-liability\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1329013231-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1329013231-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1329013231-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1329013231-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-29T12:11:03-04:00\">September 29, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">14 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tDeferred tax liability: A practical guide\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-3 post-27939 post type-post status-publish format-standard has-post-thumbnail hentry category-money-matters category-strategy-legal-operations tag-boss-your-business tag-business-intelligence tag-compliance tag-growing-a-business tag-small-business tag-staying-competitive business_type-small-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/invoice-vs-receipt\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-814559004-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-814559004-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-814559004-768x432.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-814559004-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-28T06:31:39-04:00\">September 28, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">10 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tInvoice vs. receipt: What\u2019s the difference and why does it matter?\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-4 post-27959 post type-post status-publish format-standard has-post-thumbnail hentry category-growth-customers category-money-matters category-strategy-legal-operations category-trends-insights tag-accounting-101 tag-business-intelligence tag-digital-transformation tag-ecommerce tag-small-business business_type-small-business business_type-accountants business_type-growing-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-an-electronic-invoice\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1338373163-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1338373163-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1338373163-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1338373163-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-28T05:34:23-04:00\">September 28, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat is e-invoicing? Benefits and disadvantages\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n<\/section>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A reliable construction cost estimate keeps your bids competitive and your margins protected. Here&#8217;s how experienced contractors turn project details into a defensible number.<\/p>\n","protected":false},"author":1847,"featured_media":32150,"menu_order":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_is_cornerstone":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_opengraph-image-id":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_yoast_wpseo_twitter-image":"","_yoast_wpseo_twitter-image-id":"","_yoast_wpseo_schema_page_type":"","_yoast_wpseo_schema_article_type":"","_sage_video":false,"_yoast_wpseo_focuskeywords":"[{\"keyword\":\"construction cost estimate\",\"score\":81},{\"keyword\":\"construction estimating\",\"score\":81},{\"keyword\":\"construction cost estimation\",\"score\":61},{\"keyword\":\"estimated construction cost\",\"score\":81}]","_yoast_wpseo_keywordsynonyms":"[\"\",\"\",\"\",\"\",\"\"]","_yoast_wpseo_primary_category":"404","sage_membership_post_content_type":"article","sage_membership_post_featured_video_id":"","sage_membership_post_video_type":"trailer","sage_membership_post_featured_video_duration":"","post_featured_image_hide":false,"sage_hide_published_date":false,"sage_hide_read_time":false,"sage_hide_share_buttons":false,"_pwl_sage_podcast_buzzsprout_src":"","footnotes":""},"categories":[404],"tags":[195,399,192,180,184,153,272,34,155],"business_type":[40,41],"lilypad":[],"context":[],"industry":[50],"persona":[100,98,96,97],"imagine_tag":[246,468,437,434,233,230],"coauthors":[592,1059],"class_list":["post-32431","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-boss-your-business","tag-business-continuity","tag-construction","tag-construction-financial-management","tag-construction-it","tag-growing-a-business","tag-productivity","tag-small-business","tag-staying-competitive","business_type-small-business","business_type-growing-business","industry-construction-and-real-estate"],"sage_meta":{"region":"en-us","author_name":"Joe Church Woods","featured_image":"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0683.jpeg","imagine_tags":{"246":"Construction","468":"Grow your business","437":"Intacct Construction","434":"Large Business","233":"Medium Businesses","230":"Small business"}},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Sage Advice US","distributor_original_site_url":"https:\/\/www.sage.com\/en-us\/blog","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/32431","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/users\/1847"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/comments?post=32431"}],"version-history":[{"count":3,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/32431\/revisions"}],"predecessor-version":[{"id":38010,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/32431\/revisions\/38010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media\/32150"}],"wp:attachment":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media?parent=32431"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/categories?post=32431"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/tags?post=32431"},{"taxonomy":"business_type","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/business_type?post=32431"},{"taxonomy":"lilypad","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/lilypad?post=32431"},{"taxonomy":"context","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/context?post=32431"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/industry?post=32431"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/persona?post=32431"},{"taxonomy":"imagine_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/imagine_tag?post=32431"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/coauthors?post=32431"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}