{"id":32934,"date":"2025-09-23T09:00:00","date_gmt":"2025-09-23T13:00:00","guid":{"rendered":"https:\/\/www.sage.com\/en-us\/blog\/?p=32934"},"modified":"2025-12-03T05:48:09","modified_gmt":"2025-12-03T10:48:09","slug":"manufacturing-production-planning-template","status":"publish","type":"post","link":"https:\/\/www.sage.com\/en-us\/blog\/manufacturing-production-planning-template\/","title":{"rendered":"Manufacturing production planning: Free template"},"content":{"rendered":"<header class=\"entry-header has-dark-background-color entry-header--has-illustration entry-header--has-illustration--generic\">\n\t<div class=\"container\">\n\t\t<div class=\"entry-header__row row align-center\">\n\t\t\t<div class=\"col col-lg-7 col-xlg-6 entry-header__content\">\n\t\t\t\t\t\t\t<div class=\"component component-single-header\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"entry-header__misc text--subtitle text--uppercase text--small\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/category\/strategy-legal-operations\/\" class=\"entry-header__link\">Strategy, Legal &amp; Operations<\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t<div class=\"entry-title-wrapper\">\n\t\t\t\t\t<h1 class=\"entry-title\">\n\t\t\t\t\t\tManufacturing production planning: Free template\t\t\t\t\t<\/h1>\n\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t<p class=\"entry-header__description\">\n\t\t\t\t\t\t\t\t\t\t\t<\/p>\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\t\t<div class=\"single-post-details container\">\n\t\t<div class=\"col\">\n\t\t\t<span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2025-09-23T09:00:00-04:00\">September 23, 2025<\/time><\/span><span class=\"reading-time\"> min read<\/span>\n\t\t<button\n\t\t\ttype=\"button\"\n\t\t\tclass=\"social-share-button button button--icon button--secondary js-social-share-button\"\n\t\t\tdata-share-title=\"Manufacturing production planning: Free template\"\n\t\t\tdata-share-url=\"https:\/\/www.sage.com\/en-us\/blog\/manufacturing-production-planning-template\/\"\n\t\t\tdata-share-text=\"Please read this interesting article\"\n\t\t>\n\t\t\t<span class=\"social-share-button__share-label\">Share<\/span>\n\t\t\t<span class=\"social-share-button__copy-label\" hidden>Copy Link<\/span>\n\t\t\t<span class=\"social-share-button__copy-tooltip\" aria-hidden=\"true\" hidden>Copied<\/span>\n\t\t<\/button>\n\n\t\t\t\t<\/div>\n\t<\/div>\n\t<\/header>\n\n\n\n<div class=\"wp-block-post-author has-dark-background-color alignfull\">\n\t<div class=\"container\">\n\t\t<div class=\"col\">\n\t\t\t\t\t\t\t<div class=\"co-authors\">\n\t\t\t\t\t\n\t\t<div class=\"entry-author-wrapper\">\n\t\t\t<a class=\"entry-author\" href=\"https:\/\/www.sage.com\/en-us\/blog\/author\/joechurchwoods\/\">\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"40\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/05\/Joe-Yard-2-crop-350x350.jpg\" class=\"entry-author__image\" alt=\"Joe Church Woods\" \/>\t\t\t\t<span class=\"entry-author__name\">Joe Church Woods<\/span>\n\t\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/div>\n\n\n\n\n\n<p>Whether you\u2019re just getting started or looking to upgrade your existing process, this article will walk you through expert tips and common pitfalls in manufacturing production planning. <\/p>\n\n\n\n<p>It includes real-world examples from brands like&nbsp;Caraway,&nbsp;COOLA, and&nbsp;Brooklinen, demonstrating how adopting the right tools can take your production planning to the next level.<\/p>\n\n\n\n<p><strong>Here&#8217;s what we&#8217;ll cover: <\/strong><\/p>\n\n\n<?xml encoding=\"utf-8\" ?><div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\"><ul><li><a href=\"#h-key-takeaways-at-a-glance\" data-level=\"2\">Key takeaways at a glance<\/a><\/li><li><a href=\"#wpBlockID2\" data-level=\"2\">What is production planning in manufacturing?<\/a><\/li><li><a href=\"#wpBlockID3\" data-level=\"2\">What are the three stages of production planning?<\/a><\/li><li><a href=\"#wpBlockID4\" data-level=\"2\">What are the benefits of manufacturing production planning?<\/a><\/li><li><a href=\"#h-strong-production-planning-is-a-competitive-advantage\" data-level=\"2\">Strong production planning is a competitive advantage<\/a><\/li><li><a href=\"#wpBlockID5\" data-level=\"2\">How do I create a production plan in Excel?<\/a><\/li><li><a href=\"#wpBlockID6\" data-level=\"2\">Where can I find a free production planning template for Excel?<\/a><\/li><li><a href=\"#wpBlockID7\" data-level=\"2\">How can I take my manufacturing production planning beyond Excel?<\/a><\/li><\/ul><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-key-takeaways-at-a-glance\">Key takeaways at a glance<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Production planning<\/strong>&nbsp;is the process of mapping out every step in manufacturing a product, so that the production process is efficient and nothing important is overlooked. A clear plan aligns everyone involved\u2014from sourcing materials to delivery\u2014preventing bottlenecks&nbsp;that could slow or halt production.<\/li>\n\n\n\n<li><strong>Using a production planning template<\/strong>&nbsp;provides a ready-made framework for this process, ensuring all key details (materials, schedules, responsibilities, etc.) are captured. This not only saves time but also improves supply chain visibility so you can see issues early and&nbsp;keeps teams on the same page.<\/li>\n\n\n\n<li><strong>Key stages in <strong>manufacturing <\/strong>production planning include:<\/strong>&nbsp;1) planning \u2013 defining goals, forecasting demand, and preparing resources; 2) action\u2014executing the production steps (from issuing job orders to final assembly); and 3) control\u2014monitoring progress with real-time reporting and metrics, and making adjustments as needed. Completing all stages in order is crucial to avoid missed steps and delays.<\/li>\n\n\n\n<li><strong>Benefits of a solid production plan include<\/strong>&nbsp;optimized resource use (you produce exactly what\u2019s needed when it\u2019s needed); better logistics milestone tracking (coordinating production schedules with shipping deadlines to avoid surprises); and team-wide clarity. Companies that invest in thorough production planning often see fewer stockouts or rush orders, improved on-time delivery, and cost savings.<\/li>\n\n\n\n<li><strong>Get started fast:<\/strong>&nbsp;download Sage Supply Chain Intelligence\u2019s free Excel manufacturing production planning template&nbsp;to jump-start your own production plan.&nbsp;<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"#gate-b0ca3185-e99e-474a-9c1e-932af7e722ef\">Download our free production planning template<\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"wpBlockID2\">What is production planning in manufacturing?<\/h2>\n\n\n\n<p>Manufacturing production planning is a systematic approach to organizing all the steps involved in producing a good or product. <\/p>\n\n\n\n<p>It serves as a detailed guide that outlines what needs to be produced, how much to produce, when to produce it, and which resources (materials, labor, equipment) are required at each stage.<\/p>\n\n\n\n<p>The ultimate goal of production planning is to create a more streamlined production process that lends itself to greater efficiency. <\/p>\n\n\n\n<p>More efficient processes lead to overall improvement in metrics and key performance indicators (KPIs)\u2014and ultimately, stronger margins and profits to boost your bottom line.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What does a production plan typically include?<\/h3>\n\n\n\n<p>A good production plan makes the process more organized and efficient by ensuring no critical step is forgotten. <\/p>\n\n\n\n<p>Everyone involved\u2014from the factory floor to the supply chain managers\u2014should understand the plan from the small details to the big picture.<\/p>\n\n\n\n<p>The plan typically includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Product details and target quantities.<\/li>\n\n\n\n<li>Bill of materials (BOM).<\/li>\n\n\n\n<li>Resource requirements.<\/li>\n\n\n\n<li>Schedule of operations.<\/li>\n\n\n\n<li>Delivery timeline.<\/li>\n\n\n\n<li>Assigned responsibilities.<\/li>\n\n\n\n<li>Quality checkpoints.<\/li>\n<\/ul>\n\n\n\n<p>The plan acts as a single source of truth for the entire production process. <\/p>\n\n\n\n<p>Using a&nbsp;manufacturing production schedule template&nbsp;can help you build this framework quickly and consistently to ensure manufacturing stays on course.&nbsp;<\/p>\n\n\n\n<p>When the production process goes to plan, brands and consumers both benefit.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"#gate-b0ca3185-e99e-474a-9c1e-932af7e722ef\">Download our free production planning template<\/a><\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">What\u2019s the difference between a production plan and a production schedule?<\/h3>\n\n\n\n<p>Both&nbsp;<a href=\"https:\/\/smallbusiness.chron.com\/must-considered-production-planning-18978.html\" target=\"_blank\" rel=\"noreferrer noopener\">production schedules and production plans<\/a>&nbsp;deal with the organization and high-level strategies around production. And while there are similarities, the two terms mean different things.&nbsp;<\/p>\n\n\n\n<p>A production schedule has clearly defined and assigned roles for each step of the manufacturing process, along with the timeline for when those tasks need to be accomplished. <\/p>\n\n\n\n<p>The production plan, on the other hand, determines what needs to be produced and how much of it needs to be completed in each run.&nbsp;<\/p>\n\n\n\n<p>Another way to think about the two is that the production plan outlines the \u201cwhat\u201d\u2014the steps and materials needed to produce a good\u2014while the production schedule outlines the \u201cwho\u201d and \u201cwhen\u201d\u2014who is responsible for each step of the process and when they need to have them done.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Production plan<\/strong><\/td><td><strong>Production schedule<\/strong><\/td><\/tr><tr><td>Focuses on goals and resources<\/td><td>Focuses on timing and task assignments<\/td><\/tr><tr><td>Includes materials, equipment, and flow<\/td><td>Includes dates, times, and personnel<\/td><\/tr><tr><td>Sets the roadmap for operations<\/td><td>Executes that roadmap on a timeline<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Together, they form the foundation of a well-organized production process\u2014one strategic, one tactical.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"wpBlockID3\">What are the three stages of production planning?<\/h2>\n\n\n\n<p>Production planning usually unfolds in three essential stages. Each stage builds on the last, ensuring your production stays efficient, aligned, and adaptable.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Planning phase<\/h3>\n\n\n\n<p>This is the foundation. You define production goals, forecast demand, and assess what resources are needed.<\/p>\n\n\n\n<p>Key steps of the planning phase include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Product development and design:&nbsp;<\/strong>finalizing what product you will produce and its specifications.<\/li>\n\n\n\n<li><strong>Demand forecasting:<\/strong>&nbsp;estimating how many units you need to produce in a given timeframe (based on sales forecasts or customer orders).<\/li>\n\n\n\n<li><strong>Aggregate planning:<\/strong>&nbsp;high-level planning of production output versus capacity over a medium-term horizon (usually 3\u201318 months).<\/li>\n\n\n\n<li><strong>Resource and raw material planning:<\/strong>&nbsp;<a href=\"https:\/\/www.sage.com\/en-us\/blog\/how-supplier-diversification-mitigates-risks\/\" target=\"_blank\" rel=\"noreferrer noopener\">collaborating with suppliers<\/a>&nbsp;to ensure you have the necessary materials and components on hand (or ordered) to meet the production targets. This step is closely tied to <a href=\"https:\/\/www.sage.com\/en-us\/blog\/supply-chain-diagram\/\" target=\"_blank\" rel=\"noreferrer noopener\">supply chain planning<\/a>\u2014you might plan purchase orders for raw materials and schedule their arrival to align with production.<\/li>\n<\/ul>\n\n\n\n<p>By the end of the planning phase, you should have a clear production strategy: defined goals (e.g. quantity and timeline), a sense of the resources required, and a broad schedule outline.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Action phase<\/h3>\n\n\n\n<p>The action phase of the production plan outlines the different steps that need to be taken in order to create the product that your plan is for. <\/p>\n\n\n\n<p>This phase addresses all of the steps of production, from the initial job order to the final delivery and everything in between.&nbsp;<\/p>\n\n\n\n<p>Key steps of the action phase include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Process routing:<\/strong>&nbsp;laying out the exact sequence of operations or processes the product will go through (for example: cutting \u2192 assembly \u2192 packaging).<\/li>\n\n\n\n<li><strong>Scheduling and loading:<\/strong>&nbsp;assigning start and end times for each operation and loading work onto machines or work centers according to their capacity. This is essentially the production schedule being defined, ensuring that each task is scheduled with a person\/machine and time slot.<\/li>\n\n\n\n<li><strong>Detailed material planning:&nbsp;<\/strong>confirming that materials will be at the right place at the right time for each production step. For instance, making sure components are delivered to the assembly line just as assembly is scheduled to start (this is akin to&nbsp;just-in-time inventory management&nbsp;principles).<\/li>\n\n\n\n<li><strong>Tooling and equipment preparation:<\/strong>&nbsp;planning any specific tools, molds, or machines needed for each step, and ensuring they are available and set up.<\/li>\n\n\n\n<li><strong>Quality checks and in-process inspections:<\/strong>&nbsp;incorporating any&nbsp;<a href=\"https:\/\/www.sage.com\/en-us\/blog\/the-ultimate-supplier-audit-checklist\/\" target=\"_blank\" rel=\"noreferrer noopener\">quality control<\/a>&nbsp;steps during production (e.g., checking a sample every batch or verifying dimensions after a machining step).<\/li>\n<\/ul>\n\n\n\n<p>In short, the action phase documents everything that needs to happen on the ground to produce the product according to the plan. <\/p>\n\n\n\n<p>By detailing this, you create a step-by-step guide that the operations team can follow, and you can more easily spot if something is missing or unrealistic before it becomes a problem.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Control phase<\/h3>\n\n\n\n<p>Manufacturing production planning doesn\u2019t end once production begins. The control phase is the third critical stage, focused on monitoring, reporting, and adjusting. <\/p>\n\n\n\n<p>Even the best plan may need tweaks when put into practice, and this phase is about ensuring the plan\u2019s outcomes meet the goals, or taking corrective action if they don\u2019t.<\/p>\n\n\n\n<p>Key steps of the control phase include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Progress reporting:<\/strong>&nbsp;tracking the&nbsp;<a href=\"https:\/\/www.sage.com\/en-us\/blog\/real-time-insights-with-supply-chain-dashboard-customization\/\" target=\"_blank\" rel=\"noreferrer noopener\">status of production in real time<\/a>\u2014e.g., how many units are completed, which milestones have been reached, and what remains in progress. Modern production management often uses dashboards or software that update these reports continuously\u2014more on that later.<\/li>\n\n\n\n<li><strong>Metric tracking:&nbsp;<\/strong>measuring performance against the benchmarks set in the plan across KPIs like production throughput, defect rates, on-time delivery rate.&nbsp;Tracking metrics and KPIs&nbsp;via digital tools and dashboards gives you at-a-glance insights into whether or not you are meeting production goals\u2014which can let you know if your production plan needs to be tweaked.<\/li>\n\n\n\n<li><strong>Corrective action planning:<\/strong>&nbsp;if the monitoring reveals problems or deviations (for example, a production batch is behind schedule or a quality issue is detected), the control phase involves taking action to correct course. This could mean adjusting the production schedule, reallocating resources, communicating with suppliers, or other remedies to get back on track.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>By following through all three stages\u2014planning, action, and control\u2014you create a continuous improvement cycle for production. <\/p>\n\n\n\n<p>You plan thoroughly, execute the plan, and then monitor outcomes to refine future plans. <\/p>\n\n\n\n<p>Skipping the control stage, for instance, would mean losing out on insights that could make the next production run better.&nbsp;<\/p>\n\n\n\n<p>In a well-run operation, these stages overlap in practice (as one batch is in the action phase you might already be planning the next and controlling the one in progress). <\/p>\n\n\n\n<p>But conceptually, covering all three ensures your production plan is comprehensive and dynamically managed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"wpBlockID4\">What are the benefits of manufacturing production planning?<\/h2>\n\n\n\n<p>A solid production plan improves performance across every part of your operation\u2014from inventory and labor efficiency to delivery reliability and team alignment.<\/p>\n\n\n\n<p>Top benefits include:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">1. Avoiding confusion, waste, and delays&nbsp;<\/h3>\n\n\n\n<p>When every step is mapped out, you significantly reduce the likelihood of mistakes like missing components, idle downtime, or miscommunication between teams. <\/p>\n\n\n\n<p>The entire organization knows what the production process is and what to expect.&nbsp;<\/p>\n\n\n\n<p>This means fewer&nbsp;fire drills\u2014you\u2019re not scrambling to respond to last-minute crises because you\u2019ve anticipated needs in advance. <\/p>\n\n\n\n<p>Ultimately, this leads to a better customer experience, as you\u2019re able to deliver on promises to customers and meet order deadlines reliably.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">2. Resource management and cost control&nbsp;<\/h3>\n\n\n\n<p>A good production plan optimizes the use of resources, including labor, machinery, and raw materials.<\/p>\n\n\n\n<p>Rather than carrying excess inventory, \u201cjust in case,\u201d or suffering material shortages, you plan exactly what you need, when you need it.&nbsp;<\/p>\n\n\n\n<p>This level of planning helps avoid <a href=\"https:\/\/www.sage.com\/en-us\/blog\/reduce-lead-time-in-supply-chain\/\" target=\"_blank\" rel=\"noreferrer noopener\">supply chain hold-ups<\/a> or unnecessary expenses by ensuring materials arrive in time without overstocking. <\/p>\n\n\n\n<p>It improves <a href=\"https:\/\/www.sage.com\/en-us\/inventory-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">inventory management<\/a> and often shortens lead times, which can translate to cost savings and improved cash flow.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3. Supply chain planning and visibility<\/h3>\n\n\n\n<p>Production planning isn\u2019t isolated to the factory, it\u2019s intertwined with your broader supply chain. A robust plan feeds into&nbsp;<a href=\"https:\/\/www.sage.com\/en-us\/blog\/glossary\/what-is-supply-chain-visibility\/\" target=\"_blank\" rel=\"noreferrer noopener\">supply chain visibility<\/a>, letting you coordinate with&nbsp;suppliers and logistics. <\/p>\n\n\n\n<p>For example, by planning production runs and logistics milestones together, you can time the delivery of materials and the shipment of finished goods to minimize waiting periods.&nbsp;<\/p>\n\n\n\n<p>This end-to-end visibility is strategically valuable: it lets you spot risks upstream (like a delayed supplier shipment) and adjust before it causes a production shutdown. <\/p>\n\n\n\n<p>When brands invest in visibility and smarter planning, they&nbsp;cut losses from disruptions&nbsp;roughly in half by avoiding last-minute reactions.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.sage.com\/en-us\/products\/supply-chain-intelligence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Explore Sage Supply Chain Intelligence<\/a><\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">4. Internal alignment and collaboration<\/h3>\n\n\n\n<p>A production plan serves as a single reference point that aligns all departments\u2014from procurement and production to sales and logistics. <\/p>\n\n\n\n<p>By sharing a clear plan across the organization, everyone from machine operators to upper management stays on the same page.&nbsp;<\/p>\n\n\n\n<p>This greatly reduces internal conflict or contradictory priorities. <\/p>\n\n\n\n<p>For instance, the sales team knows the manufacturing timelines and the production team knows upcoming order requirements, so there\u2019s less finger-pointing and more coordinated effort.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">5. Goal and milestone tracking<\/h3>\n\n\n\n<p>A plan&nbsp;establishes benchmarks&nbsp;and milestones (e.g. production start dates, completion dates for each batch, quality checkpoints). <\/p>\n\n\n\n<p>This makes it easy to track progress and measure performance.&nbsp;<\/p>\n\n\n\n<p>Hitting these milestones on time is a good indicator your production process is under control; missing them provides an early warning to dive in and solve a problem. <\/p>\n\n\n\n<p>In short, logistics milestone tracking within your plan ensures that both production and delivery timelines are monitored, preventing unpleasant surprises.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">6. Data-driven improvements<\/h3>\n\n\n\n<p>As noted earlier, tracking metrics through digital means (spreadsheets or, better yet, specialized software) allows for real-time reporting on production. <\/p>\n\n\n\n<p>This means you can instantly see if you\u2019re meeting production quotas, if quality levels are within targets, or if any process is lagging behind. <\/p>\n\n\n\n<p>By analyzing these insights, companies continuously improve their processes.&nbsp;Embracing real-time visibility is a competitive advantage of production planning done right.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">7. Streamlined workflows and reduced bottlenecks<\/h3>\n\n\n\n<p>A production plan makes the entire workflow smoother. By identifying and eliminating bottlenecks in advance (or quickly when they occur), production keeps flowing. <\/p>\n\n\n\n<p>The plan coordinates all moving parts, so you\u2019re less likely to have one station idle waiting for another to finish, or a finished product waiting for packaging, etc. <\/p>\n\n\n\n<p>Everything moves like a well-orchestrated machine.&nbsp;This efficiency can yield huge performance gains. <\/p>\n\n\n\n<p>For instance,&nbsp;suncare brand COOLA discovered that before planning improvements, their teams were manually chasing updates across email threads and spreadsheets, resulting in frequent order status confusion. <\/p>\n\n\n\n<p>After streamlining their processes and improving visibility, COOLA improved on-time shipments by 28% and managed the same workload with 75% less staff involved.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">8. Improved scalability and agility<\/h3>\n\n\n\n<p>Companies with solid production planning can respond faster to changes\u2014whether it\u2019s a surge in demand, a last-minute custom order, or a supply disruption. <\/p>\n\n\n\n<p>The planning process forces you to understand your capacity and where your constraints are, so you know exactly how much you can flex and where.&nbsp;<\/p>\n\n\n\n<p>One example is&nbsp;Caraway, a kitchenware brand that leveraged strong planning and a visibility platform to ramp up production rapidly\u2014increasing order volume 11x in one year without chaos. <\/p>\n\n\n\n<p>That kind of scaling is only possible when you have tight control and insight into your production pipeline.&nbsp;<\/p>\n\n\n\n<p>Similarly, beloved consumer brand&nbsp;Brooklinen&nbsp;centralized their supply chain data and improved collaboration. This helped them achieve a 162% increase in order volume over two years, while still boosting their on-time shipment rate.&nbsp;<\/p>\n\n\n\n<p>These real-world cases show that good production planning, combined with the right tools, translates to&nbsp;growth and resilience.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.sage.com\/en-us\/success-stories\/caraway\/\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more about Caraway&#8217;s success story<\/a><\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-strong-production-planning-is-a-competitive-advantage\">Strong production planning is a competitive advantage<\/h2>\n\n\n\n<p>The benefits of production planning touch every part of the business: financial performance via efficiency and cost savings; operational performance through better throughput and fewer delays; and even relationship management by meeting customer expectations and improving supplier coordination.<\/p>\n\n\n\n<p>Some brands manufacturers hesitate to implement detailed production plans because of the perception that creating and maintaining the plan is&nbsp;a huge effort\u2014especially if they\u2019re used to a more ad-hoc approach. <\/p>\n\n\n\n<p>And building a comprehensive plan from scratch can feel overwhelming.&nbsp;<\/p>\n\n\n\n<p>However, this is exactly where using a&nbsp;production planning template&nbsp;or software can make a world of difference. <\/p>\n\n\n\n<p>A well-crafted template can alleviate the pressure of building a plan from scratch, so you can reap the benefits sooner rather than later.<\/p>\n\n\n\n<p>If you don\u2019t have a production plan in place yet, remember you can grab our free template to get started. It covers all the basics so you\u2019re not starting blank. <\/p>\n\n\n\n<p>And if you do have a plan, use the benefits above as a checklist to see if you\u2019re getting all these advantages. If not, it might be time to refine your planning process.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"#gate-b0ca3185-e99e-474a-9c1e-932af7e722ef\">Download our free production planning template<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"wpBlockID5\">How do I create a production plan in Excel?<\/h2>\n\n\n\n<p>Many production plans are built using spreadsheet software like&nbsp;Microsoft Excel&nbsp;or Google Sheets. That said, each organization functions differently, so no two production plans will be the same.&nbsp;<\/p>\n\n\n\n<p>Here\u2019s a step-by-step look at the process of creating a production plan in Excel:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Set up your timeline:<\/strong>&nbsp;use a Gantt-style view to schedule production tasks across dates.<\/li>\n\n\n\n<li><strong>List product and order details:&nbsp;<\/strong>include SKUs, order numbers, and production goals.<\/li>\n\n\n\n<li><strong>Map out your bill of materials (BOM):&nbsp;<\/strong>track quantities needed vs. on hand vs. ordered.<\/li>\n\n\n\n<li><strong>Assign milestones:<\/strong>&nbsp;document key checkpoints\u2014e.g., material arrival, production start, quality checks, shipment.<\/li>\n\n\n\n<li><strong>Assign responsibilities:<\/strong>&nbsp;note who\u2019s accountable for each stage.<\/li>\n\n\n\n<li><strong>Use formulas for dynamic updates:<\/strong>&nbsp;automate stock calculations and highlight gaps.<\/li>\n\n\n\n<li><strong>Include logistics milestones:<\/strong>&nbsp;tie production timing to supplier deliveries and outbound freight.<\/li>\n<\/ol>\n\n\n\n<p>Creating a production plan in Excel from scratch can be time-consuming, which is why a template is so valuable. <\/p>\n\n\n\n<p>A good template serves as a jumping-off point, allowing your business to plug in its specifics without starting from a blank sheet.&nbsp;<\/p>\n\n\n\n<p>It should provide the structure with all the fields mentioned above\u2014and ideally some sample data or formulas\u2014so you don\u2019t overlook vital steps or information. At the same time, it should be flexible enough for personalization.&nbsp;<\/p>\n\n\n\n<p>Sage Supply Chain Intelligence\u2019s&nbsp;free production planning template for Excel&nbsp;was built with exactly this balance in mind. <\/p>\n\n\n\n<p>It gives supply chain teams a unique, customizable approach to improve their process while ensuring all the standard bases are covered.<\/p>\n\n\n\n<p>The best part? You can fill it out to create a robust production plan in a fraction of the time it would take to format one from scratch.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"wpBlockID6\">Where can I find a free production planning template for Excel?<\/h2>\n\n\n\n<p>If you haven\u2019t already, you download Sage\u2019s free Excel template here. It\u2019s designed to help consumer brands:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Structure key production data in one place.<\/li>\n\n\n\n<li>Save time vs. building a plan from scratch.<\/li>\n\n\n\n<li>Standardize planning across teams and product lines.<\/li>\n<\/ul>\n\n\n\n<p>The legwork is already done for you\u2014all you need to do is customize the spreadsheet to fit your business:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tabs for schedule, materials, and inventory.<\/li>\n\n\n\n<li>Sample fields and formulas.<\/li>\n\n\n\n<li>Space to document responsibilities, order numbers, and milestones.<\/li>\n<\/ul>\n\n\n\n<p>It works great whether you\u2019re building your first plan or training new team members to help you scale.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"#gate-b0ca3185-e99e-474a-9c1e-932af7e722ef\">Download our free production planning template<\/a><\/div>\n<\/div>\n\n\n\n<p id=\"block-8d47ac72-1ceb-4135-90d2-3c3142b4ef04\"><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"wpBlockID7\">How can I take my manufacturing production planning beyond Excel?<\/h2>\n\n\n\n<p>As your business grows, spreadsheets often become harder to manage. That\u2019s where platforms like\u00a0<a href=\"https:\/\/www.sage.com\/en-us\/products\/supply-chain-intelligence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sage Supply Chain Intelligence<\/a>\u00a0come in.<\/p>\n\n\n\n<p>Here\u2019s how Sage Supply Chain Intelligence helps you track every purchase order, automate every step, and trust your supply chain:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Real-time visibility:<\/strong>&nbsp;live updates from suppliers, production, and logistics<\/li>\n\n\n\n<li><strong>Centralized collaboration:<\/strong>&nbsp;one source of truth across teams and partners<\/li>\n\n\n\n<li><strong>Automated milestone tracking:<\/strong>&nbsp;alerts when tasks are delayed or complete<\/li>\n\n\n\n<li><strong>Integrated reporting and dashboards:<\/strong>&nbsp;KPIs, on-time metrics, and cost insights<\/li>\n\n\n\n<li><strong>Scalability:<\/strong>&nbsp;easily handle more SKUs, suppliers, and regions<\/li>\n<\/ul>\n\n\n\n<p>If you\u2019re ready to scale smarter, Sage Supply Chain Intelligence gives you the visibility, automation, and control that spreadsheets can\u2019t match.<\/p>\n\n\n\n<p>Start streamlining your production planning from end-to-end today and avoid costly delays, stockouts, and manual busywork.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link wp-element-button\" href=\"https:\/\/www.sage.com\/en-us\/products\/supply-chain-intelligence\/\" target=\"_blank\" rel=\"noreferrer noopener\">Explore Sage Supply Chain Intelligence<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n\n\n<div class=\"single-cta\">\n\t<div class=\"single-cta__positioner\">\n\t\t<div class=\"single-cta__wrapper has-dark-background-color\">\n\t\t\t<div class=\"single-cta__content\">\n\t\t\t\t\t\t\t\t<h2 class=\"single-cta__title h3\">Subscribe to our Sage Advice Newsletter<\/h2>\n\n\t\t\t\t\t\t\t\t\t<div class=\"single-cta__description\">\n\t\t\t\t\t\t<p>Get our latest business advice delivered directly to your inbox.<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a\n\t\t\t\t\t\thref=\"#gate-ab515c6e-7e90-4c2f-a67e-113872516e8b\"\n\t\t\t\t\t\tclass=\"single-cta__button button button--primary\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>Subscribe<\/a>\n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<img decoding=\"async\" width=\"1440\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1073797282-1440x810.jpg\" class=\"single-cta__image\" alt=\"Working from home with tea in hand\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1073797282-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 33vw, 100vw\" \/>\t\t\t<\/div>\n<\/div>\n\n<section class=\"more-topics alignfull has-grey-light-background-color wp-block-sage-post-topics\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col col-12 col-lg-4\">\n\t\t\t\t<h3 class=\"more-topics__title h2\">Browse more topics from this article<\/h3>\n\t\t\t<\/div>\n\t\t\t<div class=\"col col-12 col-lg-8\">\n\t\t\t\t<ul class=\"post-tags__list\">\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/boss-your-business\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tBoss your business\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/business-strategy\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tBusiness strategy\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/distribution\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tDistribution\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/manufacturing\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tManufacturing\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/productivity\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tProductivity\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/small-business\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tSmall business\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/staying-competitive\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tStay competitive\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/supply-chain-management\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tSupply chain management\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t<\/ul>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n<div class=\"alignfull wp-block-sage-related-posts\">\n\t<section class=\"related-posts card-grid has-dark-background-color\">\n\t<div class=\"container\">\n\t\t\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"col\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--featured h1\">Explore more wisdom<\/h2>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\n\t\t\t<div class=\"row related-posts__featured\">\n\t\t\t\t<div class=\"col card-grid__item\">\n\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-0 post-29306 post type-post status-publish format-standard has-post-thumbnail hentry category-money-matters category-strategy-legal-operations tag-accounting-101 tag-boss-your-business tag-business-continuity tag-small-business business_type-small-business card-post--is-clickable\"\n>\n\t<div class=\"card-post__media-wrapper\">\n\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1215\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1415809513-1215x810.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1415809513-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1415809513-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1415809513-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"card-post__content\">\n\t\t\t\t\t<div class=\"card-post__label\">Recommended<\/div>\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-12T10:24:32-04:00\">June 12, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h3\">\n\t\t\t\t\t\t\t<a\n\t\t\t\t\tclass=\"card-post__title-link\"\n\t\t\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-a-purchase-order\/\"\n\t\t\t\t>\n\t\t\t\n\t\t\tWhat is a purchase order (PO) and how is it used?\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/p>\n\n\t\t\n\t\t\t\t\t<p class=\"card-post__description\">\n\t\t\t\tIf your business buys from suppliers, purchase orders are one of the most important controls you have. Learn what a purchase order includes, how it works, and when to use each type.\t\t\t<\/p>\n\t\t\n\t\t\t<\/div>\n\n\t<\/article>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\n\t\t\t\t\t<div class=\"row related-posts__non-featured\">\n\t\t\t\t<div class=\"col col-12\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--more h4\">More on this Topic<\/h2>\n\t\t\t\t<\/div>\n\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-1 post-30699 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-automation tag-digital-transformation tag-erp tag-inventory-management tag-supply-chain-management business_type-small-business business_type-growing-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-order-management\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-684x384.jpg\" class=\"card-post__image\" alt=\"Lady carrying cartons\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-768x432.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-11T08:52:26-04:00\">June 11, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">13 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat is order management?\u00a0\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-2 post-29310 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations category-technology-innovation tag-artificial-intelligence tag-automation tag-boss-your-business tag-cash-flow tag-cloud-financial-management tag-sage-accounting business_type-small-business business_type-growing-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/order-to-cash-process-otc-o2c\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1190223207-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1190223207-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1190223207-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1190223207-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-10T12:23:35-04:00\">June 10, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">12 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat is the Order to Cash process?\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-3 post-29062 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-boss-your-business tag-business-intelligence tag-growing-a-business tag-inventory-management tag-productivity tag-staying-competitive tag-supply-chain-management business_type-small-business business_type-growing-business\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-an-order-management-system-oms\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1417607997-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1417607997-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1417607997-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1417607997-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-10T10:25:03-04:00\">June 10, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">19 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat is an order management system?\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-4 post-36674 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-distribution tag-erp tag-sage-x3 tag-supply-chain-management business_type-small-business business_type-growing-business industry-distribution industry-wholesale-distribution\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/supply-chain-integration\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-1214x810.jpg 1214w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-04T10:56:07-04:00\">June 4, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat\u00a0is supply chain integration and why does it matter?\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n<\/section>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Revamp your manufacturing production planning with our free Excel template. Get expert tips, avoid pitfalls, and optimize your supply chain.<\/p>\n","protected":false},"author":1847,"featured_media":20179,"menu_order":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_sage_video":false,"post_featured_image_hide":false,"sage_hide_published_date":false,"sage_hide_read_time":false,"sage_hide_share_buttons":false,"footnotes":""},"categories":[44],"tags":[195,170,300,251,272,34,155,36],"business_type":[40,41],"lilypad":[],"context":[],"industry":[94,53],"persona":[98,96,97],"imagine_tag":[245,468,434,504,233,230,1032,237],"coauthors":[592],"class_list":["post-32934","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-strategy-legal-operations","tag-boss-your-business","tag-business-strategy","tag-distribution","tag-manufacturing","tag-productivity","tag-small-business","tag-staying-competitive","tag-supply-chain-management","business_type-small-business","business_type-growing-business","industry-distribution","industry-manufacturing"],"sage_meta":{"region":"en-us","author_name":"Joe Church Woods","featured_image":"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1401178939.jpg","imagine_tags":{"245":"Distribution","468":"Grow your business","434":"Large Business","504":"Manufacturing","233":"Medium Businesses","230":"Small business","1032":"Supply chain intelligence","237":"Supply Chain Management"}},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Sage Advice US","distributor_original_site_url":"https:\/\/www.sage.com\/en-us\/blog","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/32934","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/users\/1847"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/comments?post=32934"}],"version-history":[{"count":0,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/32934\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media\/20179"}],"wp:attachment":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media?parent=32934"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/categories?post=32934"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/tags?post=32934"},{"taxonomy":"business_type","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/business_type?post=32934"},{"taxonomy":"lilypad","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/lilypad?post=32934"},{"taxonomy":"context","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/context?post=32934"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/industry?post=32934"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/persona?post=32934"},{"taxonomy":"imagine_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/imagine_tag?post=32934"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/coauthors?post=32934"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}