{"id":36925,"date":"2026-07-13T09:08:26","date_gmt":"2026-07-13T13:08:26","guid":{"rendered":"https:\/\/www.sage.com\/en-us\/blog\/?p=36925"},"modified":"2026-07-13T09:08:28","modified_gmt":"2026-07-13T13:08:28","slug":"erp-implementation-failure","status":"publish","type":"post","link":"https:\/\/www.sage.com\/en-us\/blog\/erp-implementation-failure\/","title":{"rendered":"ERP Implementation Failure: Why 70% Fall Short and What It Costs Your Finance Team"},"content":{"rendered":"<header class=\"entry-header has-dark-background-color entry-header--standard entry-header--has-illustration entry-header--has-illustration--standard\">\n\t<div class=\"container\">\n\t\t<div class=\"entry-header__row row align-center\">\n\t\t\t<div class=\"col col-lg-7 col-xlg-6 entry-header__content\">\n\t\t\t\t\t\t\t<div class=\"component component-single-header\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"entry-header__misc text--subtitle text--uppercase text--small\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/category\/trends-insights\/\" class=\"entry-header__link\">Trends &amp; Insights<\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t<div class=\"entry-title-wrapper\">\n\t\t\t\t\t<h1 class=\"entry-title\">\n\t\t\t\t\t\tERP Implementation Failure: Why 70% Fall Short and What It Costs Your Finance Team\t\t\t\t\t<\/h1>\n\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t<p class=\"entry-header__description\">\n\t\t\t\t\t\tLearn why 70% of implementations miss the mark and what the real cost looks like when installation gets mistaken for implementation.\t\t\t\t\t<\/p>\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\t\t<div class=\"single-post-details container\">\n\t\t<div class=\"col\">\n\t\t\t<span class=\"posted-on \">Published <time class=\"entry-date published\" datetime=\"2026-07-13T09:08:26-04:00\">July 13, 2026<\/time><\/span><span class=\"reading-time\"> min read<\/span>\n\t\t<button\n\t\t\ttype=\"button\"\n\t\t\tclass=\"social-share-button button button--icon button--secondary js-social-share-button\"\n\t\t\tdata-share-title=\"ERP Implementation Failure: Why 70% Fall Short and What It Costs Your Finance Team\"\n\t\t\tdata-share-url=\"https:\/\/www.sage.com\/en-us\/blog\/erp-implementation-failure\/\"\n\t\t\tdata-share-text=\"Please read this interesting article\"\n\t\t>\n\t\t\t<span class=\"social-share-button__share-label\">Share<\/span>\n\t\t\t<span class=\"social-share-button__copy-label\" hidden>Copy Link<\/span>\n\t\t\t<span class=\"social-share-button__copy-tooltip\" aria-hidden=\"true\" hidden>Copied<\/span>\n\t\t<\/button>\n\n\t\t\t\t<\/div>\n\t<\/div>\n\t<\/header>\n\n\n\n<div class=\"wp-block-post-author has-dark-background-color alignfull\">\n\t<div class=\"container\">\n\t\t<div class=\"col\">\n\t\t\t\t\t\t\t<div class=\"co-authors\">\n\t\t\t\t\t\n\t\t<div class=\"entry-author-wrapper\">\n\t\t\t<a class=\"entry-author\" href=\"https:\/\/www.sage.com\/en-us\/blog\/author\/gregorygislason\/\">\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"40\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/07\/Gregory-Gislasan-350x350.jpg\" class=\"entry-author__image\" alt=\"Gregory Gislason\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/07\/Gregory-Gislasan-350x350.jpg 350w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/07\/Gregory-Gislasan.jpg 600w\" sizes=\"auto, (max-width: 40px) 100vw, 40px\" \/>\t\t\t\t<span class=\"entry-author__name\">Gregory Gislason<\/span>\n\t\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Most CFOs spend more time evaluating ERP software than evaluating who will implement it. According to Gartner, more than <a href=\"https:\/\/www.gartner.com\/en\/information-technology\/insights\/what-it-leaders-must-do-to-avoid-disappointing-erp-initiatives\" type=\"link\" id=\"https:\/\/www.gartner.com\/en\/information-technology\/insights\/what-it-leaders-must-do-to-avoid-disappointing-erp-initiatives\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>70% of ERP implementations fail to meet their original objectives<\/strong><\/a>, and most fail not because of the software but because of how it was set up. The implementation decision deserves the same rigor as the platform decision. It rarely gets it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Right now, a category of low-cost ERP vendors is offering what they call &#8220;implementation&#8221; for a few thousand dollars and a four- to six-week timeline. What they are actually delivering is something much closer to installation. The word sounds the same. The service is not. And for a CFO under budget pressure or deadline pressure, the price difference reads like an obvious win.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>This guide is for the CFO who is about to make that trade-off and wants to understand the real costs before signing.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n<?xml encoding=\"utf-8\" ?><div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\"><ul><li><a href=\"#h-implementation-vs-installation-why-the-distinction-matters-for-cfos\" data-level=\"2\">Implementation vs. Installation: Why the Distinction Matters for CFOs<\/a><\/li><li><a href=\"#h-why-70-of-erp-implementations-miss-the-mark\" data-level=\"2\">Why 70% of ERP Implementations Miss the Mark<\/a><\/li><li><a href=\"#h-the-three-costs-you-do-not-see-at-signing\" data-level=\"2\">The Three Costs You Do Not See at Signing<\/a><\/li><li><a href=\"#h-key-questions-every-cfo-should-ask-before-choosing-an-erp-implementation-partner\" data-level=\"2\">Key Questions Every CFO Should Ask Before Choosing an ERP Implementation Partner<\/a><\/li><li><a href=\"#h-evaluating-an-erp-implementation-partner\" data-level=\"2\">Evaluating an ERP implementation partner?<\/a><\/li><\/ul><\/div>\n\n\n\n<h2 id=\"h-implementation-vs-installation-why-the-distinction-matters-for-cfos\" class=\"wp-block-heading\">Implementation vs. Installation: Why the Distinction Matters for CFOs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When a vendor offers an ERP &#8220;implementation&#8221; for a few thousand dollars and a six-week timeline, the scope of their commitment is this: the platform gets configured, documentation gets delivered, and your team inherits the rest. The chart of accounts design, the revenue recognition architecture, the consolidation structure, and the data migration logic: all of it becomes your team&#8217;s responsibility.&nbsp;<strong>That is installation, not&nbsp;implementation<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<section class=\"wp-block-sage-container is-constrained is-style-bordered\"><div class=\"sage-container__inner\">\n<p class=\"wp-block-paragraph\" id=\"h-erp-installation-configures-the-software-and-delivers-documentation-architectural-decisions-transfer-to-your-team\"><strong>ERP installation<\/strong> configures the software and delivers documentation; architectural decisions transfer to your team.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>ERP implementation<\/strong> is an expert-led engagement where certified partners design chart of accounts, revenue recognition logic, and consolidation structure from the ground up.<\/p>\n<\/div><\/section>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Vendors point to modern tools as the answer. AI handles data migration. APIs connect systems seamlessly. Templates configure the chart of accounts in hours. What these tools fail to include is the judgment required to design a financial system for your specific business: how to structure dimensions for the reporting your board will demand, how to build revenue recognition logic that holds up under audit, how to set up consolidation architecture that absorbs an acquisition without a rebuild. That work still requires expertise. In an installation, it is simply not part of the engagement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.sage.com\/en-us\/erp\/implementation\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Implementation is an expert-led engagement<\/strong><\/a> where certified partners and CPAs design and build the financial system from the ground up. The architectural decisions belong to specialists with experience across hundreds of prior engagements: chart of accounts design, revenue recognition logic, consolidation structure, and data migration.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The best implementations use modern tools, including AI, to accelerate the routine work: data migration, reconciliation matching, and configuration. The difference is that those tools serve the experts making the architectural decisions, not replace them. They know what auditors will ask for, how boards expect to see numbers, and what the architecture needs to support two acquisitions from now. Your finance team&#8217;s role is to provide business context, answer questions about how the company operates, and validate that the system reflects how you want to work. The configuration, the migration, the workflow design: that is not your team&#8217;s job. In an installation, it is.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Comparing the two on a spreadsheet, where both appear as &#8220;implementation cost,&#8221; will often produce the wrong answer. The question worth asking is not what implementation costs. It is what choosing installation instead costs over time.<\/p>\n\n\n\n<h2 id=\"h-why-70-of-erp-implementations-miss-the-mark\" class=\"wp-block-heading\">Why 70% of ERP Implementations Miss the Mark<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Research by Panama Consulting identifies three factors that come up in failed implementations more than any others.<\/p>\n\n\n\n<h3 id=\"h-inadequate-change-management\" class=\"wp-block-heading\">Inadequate change management<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Without <a href=\"https:\/\/www.sage.com\/en-us\/blog\/erp-implementation-plan-6-key-phases-for-success\/\">a deliberate plan<\/a> for how teams will work, report, and reconcile in the new system, the software gets layered on top of existing processes and behavior rarely changes to match. In an installation, nobody owns this plan. The customer receives a configured platform, not a change management program.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Change management was the most-cited cause of failure in the <a href=\"https:\/\/www.panorama-consulting.com\/resource-center\/erp-report\/\" target=\"_blank\" rel=\"noreferrer noopener\">Panorama Consulting 2026 ERP Report<\/a>. Without a deliberate plan for how teams will report and reconcile in the new system, software gets layered on top of existing processes and behavior rarely changes to match. An installation engagement provides no ownership of this plan. The customer receives a configured platform, not a transition program.<\/p>\n\n\n\n<h3 id=\"h-poor-data-migration\" class=\"wp-block-heading\"><strong>Poor data migration<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Moving data from a legacy system requires mapping, cleansing, validation, and architectural decisions about what carries forward and what gets cleaned up. In an installation, this work defaults to your team, often under time pressure, and the same data quality problems transfer into the new system.<\/p>\n\n\n\n<h3 id=\"h-inexperienced-implementation-teams\" class=\"wp-block-heading\"><strong>Inexperienced implementation teams<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The people making configuration decisions determine what the system can do for the next five to ten years. In an installation model, those people are your finance staff, not certified ERP specialists with hundreds of prior implementations behind them. Decisions that seem reasonable in the moment create expensive constraints later: a chart of accounts that cannot support multi-entity consolidation, dimension structures that cannot accommodate a new product line, revenue recognition logic that fails an audit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A cheap installation is precisely what creates these conditions. When your finance team becomes the implementation team, architectural decisions get made by people who are simultaneously trying to keep the books closed, answer audit inquiries, and hit a go-live date. The path of least resistance is to take on ERP go-live risk and reproduce the existing structure in a new interface. The result is a system that looks modern but runs on the same broken logic. The migration moved the problem into better-looking software. It did not fix it.<\/p>\n\n\n\n<h2 id=\"h-the-three-costs-you-do-not-see-at-signing\" class=\"wp-block-heading\">The Three Costs You Do Not See at Signing<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The CFO who chooses installation over implementation typically sees one number at signing: a small upfront cost. The real cost structure has three components, and none of them appear in the initial proposal.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The cost of your team&#8217;s time.<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Installation shifts the architectural burden to the people already running your finance operation. For months, your controller and senior accountants become the implementation team: configuring the system, migrating data, designing workflows they were never trained to design. A properly scoped implementation still requires your team&#8217;s time, but it asks for something different: business context and decision validation, not architectural work.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The cost of doing it again.<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Companies that need to course-correct after a failed installation or mid-market ERP cost overrun often face significant remediation costs, and in some cases a full re-implementation. According to ERPresearch, mid-market ERP implementations run $150,000 to $750,000, and that is the bill the CFO faces when a failed attempt forces a proper restart. The direct cost is only part of it: add the months of books that are not audit-ready during the rebuild, and the board conversation about why the company is switching from a system it just deployed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The cost of a system that cannot grow.<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Not every installation fails outright. Some go live, function adequately, and quietly limit everything that comes after. When the company adds an entity, changes its revenue model, or acquires a competitor, the architecture either absorbs the change or it does not. A system configured under time pressure, reproducing existing structures in a new interface, typically cannot. The rebuild does not come immediately. It comes in year three or year five, when the company is larger, the architecture is more entrenched, and the cost of correcting it runs into the same six-figure range as the original implementation, for a system that is now far more complex.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ERP implementation is one of the most visible decisions a CFO makes. It touches every financial process, every board report, every audit. When investors and acquirers look at a company&#8217;s financial infrastructure, how it was set up is part of what they find. A properly implemented system is something a CFO can walk into that room with confidently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An installation is a bet that the reviewer does not look too closely.&nbsp;The failure usually surfaces in one of three places: an audit that flags control gaps, a board deadline reporting cannot meet, or an acquisition the architecture cannot absorb. In any of them, the CFO is the one who pays for it. The re-implementation bill. The credibility gap. The conversation about what happened and why.<\/p>\n\n\n\n<h2 id=\"h-key-questions-every-cfo-should-ask-before-choosing-an-erp-implementation-partner\" class=\"wp-block-heading\">Key Questions Every CFO Should Ask Before Choosing an ERP Implementation Partner<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The CFO evaluating an ERP decision is weighing a price difference between an installation and a full-service implementation. Two questions worth answering before signing:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Who is making the architectural decisions, and what do they know?<\/strong>&nbsp;In an installation model, your team makes them. In an expert-led implementation, certified partners with experience across thousands of deployments make them. The quality of those decisions determines whether the system reflects your business or a generic approximation of it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What does starting over actually cost?<\/strong>&nbsp;According to ERP Research, mid-market ERP implementations run $150,000 to $750,000. That is the bill the CFO faces when a failed installation forces a proper restart. It is worth doing that math against the price difference before the decision is made, not after the system is live and not delivering.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is not a small budget decision. ERP implementation partner selection shapes what your finance operation can do for the next five to ten years. If the next three years include a fundraiser, an audit, an acquisition, or a board that expects real-time reporting, the system needs to be built for those events. The companies that get it right build once and scale. The companies that get it wrong pay for it twice: once at installation, and once when they have to&nbsp;rebuild.<\/p>\n\n\n\n<h2 id=\"h-evaluating-an-erp-implementation-partner\" class=\"wp-block-heading\">Evaluating an ERP implementation partner? <\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Firms choosing Sage Intacct for mid-market financial management benefit most when the implementation is led by certified Sage partners rather than approached as a self-directed deployment. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Download our <a href=\"https:\/\/www.sage.com\/en-us\/erp\/implementation\/\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>implementation readiness checklist<\/strong><\/a> or speak with a certified <strong><a href=\"https:\/\/www.sage.com\/en-us\/sage-business-cloud\/intacct\/resources\/professional-services\/\" target=\"_blank\" rel=\"noreferrer noopener\">Sage Intacct implementation specialist<\/a> <\/strong>to assess your organization&#8217;s readiness before making a decision.<\/p>\n\n\n\n\n<section class=\"more-topics alignfull has-grey-light-background-color wp-block-sage-post-topics\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col col-12 col-lg-4\">\n\t\t\t\t<h3 class=\"more-topics__title h2\">Browse more topics from this article<\/h3>\n\t\t\t<\/div>\n\t\t\t<div class=\"col col-12 col-lg-8\">\n\t\t\t\t<ul class=\"post-tags__list\">\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/erp\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tERP solutions\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/sage-x3\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tSage X3\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t<\/ul>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n<div class=\"alignfull wp-block-sage-related-posts\">\n\t<section class=\"related-posts card-grid has-dark-background-color\">\n\t<div class=\"container\">\n\t\t\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"col\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--featured h1\">Explore more wisdom<\/h2>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\n\t\t\t<div class=\"row related-posts__featured\">\n\t\t\t\t<div class=\"col card-grid__item\">\n\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-0 post-30699 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-automation tag-digital-transformation tag-erp tag-inventory-management tag-supply-chain-management business_type-small-business business_type-growing-business card-post--is-clickable\"\n>\n\t<div class=\"card-post__media-wrapper\">\n\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1440\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-1440x810.jpg\" class=\"card-post__image\" alt=\"Lady carrying cartons\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-768x432.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-1355438061-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"card-post__content\">\n\t\t\t\t\t<div class=\"card-post__label\">Recommended<\/div>\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-11T08:52:26-04:00\">June 11, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">13 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h3\">\n\t\t\t\t\t\t\t<a\n\t\t\t\t\tclass=\"card-post__title-link\"\n\t\t\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-order-management\/\"\n\t\t\t\t>\n\t\t\t\n\t\t\tWhat is order management?\u00a0\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/p>\n\n\t\t\n\t\t\t\t\t<p class=\"card-post__description\">\n\t\t\t\tCustomer order management is an essential cog in the machine for any business that sells products. Learn about the order management process and how it can help you streamline operations and boost customer satisfaction.\t\t\t<\/p>\n\t\t\n\t\t\t<\/div>\n\n\t<\/article>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\n\t\t\t\t\t<div class=\"row related-posts__non-featured\">\n\t\t\t\t<div class=\"col col-12\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--more h4\">More on this Topic<\/h2>\n\t\t\t\t<\/div>\n\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-1 post-36674 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-distribution tag-erp tag-sage-x3 tag-supply-chain-management business_type-small-business business_type-growing-business industry-distribution industry-wholesale-distribution\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/supply-chain-integration\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Distribution_0305-1214x810.jpg 1214w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-04T10:56:07-04:00\">June 4, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat\u00a0is supply chain integration and why does it matter?\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-2 post-36541 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-distribution tag-sage-x3 tag-supply-chain-management business_type-small-business business_type-growing-business industry-distribution industry-wholesale-distribution\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/supply-chain-disruption\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1367106337-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1367106337-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1367106337-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1367106337-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-06-02T13:33:42-04:00\">June 2, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat is supply chain disruption and how do you manage it?\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-3 post-36633 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-distribution tag-erp tag-sage-x3 tag-supply-chain-management business_type-small-business business_type-growing-business industry-distribution industry-manufacturing industry-wholesale-distribution\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/supply-chain-strategy\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-543161718-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-543161718-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-543161718-768x432.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-543161718-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-05-27T12:27:12-04:00\">May 27, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">9 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tWhat is a supply chain strategy? Types, examples and how to build one\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-4 post-34346 post type-post status-publish format-standard has-post-thumbnail hentry category-money-matters tag-automation tag-erp business_type-growing-business industry-healthcare\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/financial-bottlenecks-in-behavior-health\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1407611614-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1407611614-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1407611614-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-1407611614-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-03-02T09:00:00-05:00\">March 2, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">4 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tFinancial Bottlenecks in Behavior Health\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n<\/section>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Learn why 70% of implementations miss the mark and what the real cost looks like when installation gets mistaken for implementation.<\/p>\n","protected":false},"author":1932,"featured_media":36929,"menu_order":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_sage_video":false,"post_featured_image_hide":false,"sage_hide_published_date":false,"sage_hide_read_time":false,"sage_hide_share_buttons":false,"_pwl_sage_podcast_buzzsprout_src":"","footnotes":""},"categories":[43,49],"tags":[13,392],"business_type":[41],"lilypad":[],"context":[],"industry":[94,53,454],"persona":[100],"imagine_tag":[463,1032],"coauthors":[1071],"class_list":["post-36925","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-money-matters","category-trends-insights","tag-erp","tag-sage-x3","business_type-growing-business","industry-distribution","industry-manufacturing","industry-wholesale-distribution"],"sage_meta":{"region":"en-us","author_name":"Gregory Gislason","featured_image":"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/06\/erp-implementation-failure.jpg","imagine_tags":{"463":"ERP","1032":"Supply chain intelligence"}},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Sage Advice US","distributor_original_site_url":"https:\/\/www.sage.com\/en-us\/blog","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/36925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/users\/1932"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/comments?post=36925"}],"version-history":[{"count":5,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/36925\/revisions"}],"predecessor-version":[{"id":37148,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/36925\/revisions\/37148"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media\/36929"}],"wp:attachment":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media?parent=36925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/categories?post=36925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/tags?post=36925"},{"taxonomy":"business_type","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/business_type?post=36925"},{"taxonomy":"lilypad","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/lilypad?post=36925"},{"taxonomy":"context","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/context?post=36925"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/industry?post=36925"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/persona?post=36925"},{"taxonomy":"imagine_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/imagine_tag?post=36925"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/coauthors?post=36925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}