{"id":37999,"date":"2026-09-25T11:07:54","date_gmt":"2026-09-25T15:07:54","guid":{"rendered":"https:\/\/www.sage.com\/en-us\/blog\/?p=37999"},"modified":"2026-09-25T11:07:57","modified_gmt":"2026-09-25T15:07:57","slug":"engineering-kpis","status":"publish","type":"post","link":"https:\/\/www.sage.com\/en-us\/blog\/engineering-kpis\/","title":{"rendered":"Engineering KPIs: 10 metrics for financial performance"},"content":{"rendered":"<header class=\"entry-header has-dark-background-color entry-header--standard entry-header--has-illustration entry-header--has-illustration--standard\">\n\t<div class=\"container\">\n\t\t<div class=\"entry-header__row row align-center\">\n\t\t\t<div class=\"col col-lg-7 col-xlg-6 entry-header__content\">\n\t\t\t\t\t\t\t<div class=\"component component-single-header\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"entry-header__misc text--subtitle text--uppercase text--small\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/category\/money-matters\/\" class=\"entry-header__link\">Money Matters<\/a>\t\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t<div class=\"entry-title-wrapper\">\n\t\t\t\t\t<h1 class=\"entry-title\">\n\t\t\t\t\t\tEngineering KPIs: 10 metrics for financial performance\t\t\t\t\t<\/h1>\n\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t<p class=\"entry-header__description\">\n\t\t\t\t\t\tEngineering KPIs help teams connect project activity to financial performance, improve profitability and cash flow, strengthen forecasting, and make better pricing, staffing, and growth decisions. \t\t\t\t\t<\/p>\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n\t\t<div class=\"single-post-details container\">\n\t\t<div class=\"col\">\n\t\t\t<span class=\"posted-on \">Published <time class=\"entry-date published\" datetime=\"2026-09-25T11:07:54-04:00\">September 25, 2026<\/time><\/span><span class=\"reading-time\"> min read<\/span>\n\t\t<button\n\t\t\ttype=\"button\"\n\t\t\tclass=\"social-share-button button button--icon button--secondary js-social-share-button\"\n\t\t\tdata-share-title=\"Engineering KPIs: 10 metrics for financial performance\"\n\t\t\tdata-share-url=\"https:\/\/www.sage.com\/en-us\/blog\/engineering-kpis\/\"\n\t\t\tdata-share-text=\"Please read this interesting article\"\n\t\t>\n\t\t\t<span class=\"social-share-button__share-label\">Share<\/span>\n\t\t\t<span class=\"social-share-button__copy-label\" hidden>Copy Link<\/span>\n\t\t\t<span class=\"social-share-button__copy-tooltip\" aria-hidden=\"true\" hidden>Copied<\/span>\n\t\t<\/button>\n\n\t\t\t\t<\/div>\n\t<\/div>\n\t<\/header>\n\n\n\n<div class=\"wp-block-post-author has-dark-background-color alignfull\">\n\t<div class=\"container\">\n\t\t<div class=\"col\">\n\t\t\t\t\t\t\t<div class=\"co-authors\">\n\t\t\t\t\t\n\t\t<div class=\"entry-author-wrapper\">\n\t\t\t<a class=\"entry-author\" href=\"https:\/\/www.sage.com\/en-us\/blog\/author\/lauraslingo\/\">\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"40\" height=\"40\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/03\/laura-slingo-headshot-350x350.jpg\" class=\"entry-author__image\" alt=\"Laura Slingo\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/03\/laura-slingo-headshot-350x350.jpg 350w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2026\/03\/laura-slingo-headshot.jpg 400w\" sizes=\"auto, (max-width: 40px) 100vw, 40px\" \/>\t\t\t\t<span class=\"entry-author__name\">Laura Slingo<\/span>\n\t\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t<\/div>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering firms are built on technical expertise. But delivering great work doesn&#8217;t automatically mean every project is profitable\u2014or that a busy pipeline is translating into healthy financial performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A team can be fully booked while margins slip. A growing backlog can put pressure on capacity. And profitable work on paper can still leave cash tight if billing and collections fall behind.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That&#8217;s where engineering Key Performance Indicators (KPIs) earn their place. The right KPIs connect what&#8217;s happening across projects, people, billing, and finance, helping you see not just how busy the firm is, but how effectively that work is turning into revenue, profit, and sustainable growth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In this guide, we&#8217;ll look at 10 examples of engineering KPIs that matter for financial performance, how to interpret them, and how to bring them together in an engineering KPI dashboard that supports better decisions.<\/p>\n\n\n<section id=\"key-takeaways\" class=\"wp-block-sage-key-takeaways\"><div class=\"sage-key-takeaways__inner\"><h2 class=\"wp-block-heading has-h-3-font-size\">Key takeaways<\/h2>\n<ul class=\"wp-block-list\">\n<li>Engineering KPIs are most useful when they connect project activity, labor, billing, and financial results rather than measuring activity in isolation.<\/li>\n\n\n\n<li>Project margin, utilization, realization, and net multiplier can show how effectively project work is turning into profitable revenue.<\/li>\n\n\n\n<li>DSO, cash flow, backlog, and forecasts help you look ahead to potential pressure on cash, capacity, and growth.<\/li>\n\n\n\n<li>Consistent definitions and connected accounting, project, time, billing, and resource data make KPI reporting more reliable and easier to act on.<\/li>\n<\/ul>\n<\/div><\/section>\n\n\n<h2 id=\"h-here-s-what-we-ll-cover\" class=\"wp-block-heading\">Here&#8217;s what we&#8217;ll cover<\/h2>\n\n\n<?xml encoding=\"utf-8\" ?><div class=\"wp-block-yoast-seo-table-of-contents yoast-table-of-contents\"><ul><li><a href=\"#h-what-are-engineering-kpis\" data-level=\"2\">What are engineering KPIs?<\/a><\/li><li><a href=\"#h-what-are-the-most-important-engineering-kpis-for-financial-performance\" data-level=\"2\">What are the most important engineering KPIs for financial performance?<\/a><\/li><li><a href=\"#h-why-should-engineering-firms-track-kpis\" data-level=\"2\">Why should engineering firms track KPIs?<\/a><\/li><li><a href=\"#h-how-should-engineering-firms-choose-the-right-kpis\" data-level=\"2\">How should engineering firms choose the right KPIs?<\/a><\/li><li><a href=\"#h-how-can-engineering-firms-track-and-report-kpis-effectively\" data-level=\"2\">How can engineering firms track and report KPIs effectively?<\/a><\/li><li><a href=\"#h-how-can-accounting-software-improve-engineering-kpi-tracking\" data-level=\"2\">How can accounting software improve engineering KPI tracking?<\/a><\/li><li><a href=\"#h-frequently-asked-questions-about-engineering-kpis\" data-level=\"2\">Frequently asked questions about engineering KPIs<\/a><\/li><\/ul><\/div>\n\n\n\n<h2 id=\"h-what-are-engineering-kpis\" class=\"wp-block-heading\">What are engineering KPIs?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering KPIs are measurable indicators that show how effectively an engineering firm is turning project work, people, and resources into financial results. They can help you see whether projects are profitable, whether capacity is being used effectively, and whether completed work is translating into revenue and cash.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For project-based engineering firms, that matters because labor sits at the center of both delivery and financial performance. Staffing decisions, project scope, billing rates, and schedules can quickly affect margins, <a href=\"https:\/\/www.sage.com\/en-us\/blog\/why-you-should-be-doing-cash-flow-analysis\/\">cash flow<\/a>, and growth, so the most useful KPIs connect those areas rather than reporting each figure in isolation.<\/p>\n\n\n\n<h3 id=\"h-what-s-the-difference-between-engineering-kpis-and-metrics\" class=\"wp-block-heading\">What&#8217;s the difference between engineering KPIs and metrics?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Metrics measure activity or performance, while KPIs are the smaller set of metrics tied to a specific business objective and used to inform decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An engineering firm might track hundreds of engineering performance metrics, but that doesn\u2019t mean every number belongs to a <a href=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-a-real-time-dashboard\/\">KPI dashboard<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The difference becomes clearer when you look at how basic operational data gains financial context:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Total hours recorded<\/strong> show how much time your team has worked but tell you little about the financial value of that time on their own.<\/li>\n\n\n\n<li><strong>Utilization<\/strong> shows how much available capacity is being directed toward project or billable work.<\/li>\n\n\n\n<li><strong>Realization<\/strong> shows how much of the value of that billable work ultimately becomes billed revenue.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Together, those measures take you from simply tracking activity to understanding how that activity contributes to financial performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The aim isn\u2019t to fill a dashboard with every number you can measure, but to focus on the engineering team metrics that help you make better decisions about pricing, staffing, project delivery, cash management, and growth.<\/p>\n\n\n\n<h3 id=\"h-what-are-leading-and-lagging-engineering-kpis\" class=\"wp-block-heading\">What are leading and lagging engineering KPIs?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Leading KPIs are metrics that give you an indication of what may happen next, while lagging KPIs show the results of activity that has already taken place. Looking at both gives you a more complete picture of performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Backlog and other forward-looking measures, for example, can help you anticipate changes in workload, revenue, or capacity before they fully affect financial results. Lagging measures, such as project <a href=\"https:\/\/www.sage.com\/en-us\/blog\/margin-calculator\/\">profit margin<\/a> and realization, show how effectively work has already translated into profit and billed revenue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The distinction isn\u2019t always clear-cut. Utilization reflects what\u2019s happening now, but a sustained fall could also warn of weaker revenue ahead.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That\u2019s why leading and lagging KPIs work best together: one helps you understand where you\u2019ve been, while the other gives you more time to respond to what may be coming next.<\/p>\n\n\n\n<h2 id=\"h-what-are-the-most-important-engineering-kpis-for-financial-performance\" class=\"wp-block-heading\">What are the most important engineering KPIs for financial performance?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The top 10 engineering KPIs that can help you build a useful view of your business are project profit margin, billable utilization rate, realization rate, net multiplier, project budget variance, days sales outstanding, operating cash flow, backlog, forecast accuracy, and revenue per employee.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">No single KPI tells you how an engineering firm is performing. Some tell you how projects are performing today; others flag what could be coming next. Used together, they give you a clearer picture of profitability, capacity, cash flow, and future growth.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-first-column\"><table class=\"has-fixed-layout\"><thead><tr><th>KPI<\/th><th><strong>What it measures<\/strong><\/th><th><strong>Why it matters<\/strong><\/th><th><strong>Formula or data required<\/strong><\/th><\/tr><\/thead><tbody><tr><td>Project profit margin<\/td><td>Profit generated as a percentage of project revenue.<\/td><td>Shows whether individual projects are delivering the financial return you expect.<\/td><td>(Net revenue \u2013 total project costs) \u00f7 net revenue \u00d7 100<\/td><\/tr><tr><td>Billable utilization rate<\/td><td>Share of available working time spent on billable work.<\/td><td>Connects team capacity with revenue-generating activity.<\/td><td>Billable hours \u00f7 available hours \u00d7 100<\/td><\/tr><tr><td>Realization rate<\/td><td>How much of the value of billable work becomes billed revenue.<\/td><td>Highlights write-downs, scope issues, or work that isn&#8217;t converting into revenue.<\/td><td>Billed revenue \u00f7 value of billable work \u00d7 100<\/td><\/tr><tr><td>Net multiplier<\/td><td>Net revenue generated for each dollar of direct labor cost.<\/td><td>Shows how effectively labor is being converted into revenue.<\/td><td>Net revenue \u00f7 direct labor cost<\/td><\/tr><tr><td>Project budget variance<\/td><td>Difference between actual and budgeted project costs.<\/td><td>Helps identify overruns and improve future estimating and project control.<\/td><td>(Actual cost \u2013 budgeted cost) \u00f7 budgeted cost \u00d7 100<\/td><\/tr><tr><td>Days sales outstanding (DSO)<\/td><td>How long it takes to collect receivables.<\/td><td>Shows how efficiently billed work is turning into cash.<\/td><td>Accounts receivable \u00f7 credit sales \u00d7 days in the period<\/td><\/tr><tr><td>Operating cash flow<\/td><td>Cash generated or used by normal business operations.<\/td><td>Shows whether operations are producing enough liquidity to meet ongoing commitments.<\/td><td>Cash flow statement and accounting data<\/td><\/tr><tr><td>Backlog<\/td><td>Contracted work that has been won but not yet completed or recognized as revenue.<\/td><td>Provides visibility into future workload, revenue, and capacity needs.<\/td><td>Contract and project data<\/td><\/tr><tr><td>Forecast accuracy<\/td><td>How closely forecasts match actual results.<\/td><td>Helps improve revenue, cost, resource, and cash planning.<\/td><td>Forecast versus actual results using a consistent variance or error method<\/td><\/tr><tr><td>Revenue per employee<\/td><td>Revenue generated relative to workforce size.<\/td><td>Provides a high-level view of financial productivity as staffing changes.<\/td><td>Total revenue \u00f7 average number of employees<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 id=\"h-1-project-profit-margin\" class=\"wp-block-heading\">1. Project profit margin<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Project profit margin answers a fundamental question: Are your projects generating the expected financial return?<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It expresses project profit as a percentage of revenue, making it easier to compare financial performance across projects of different sizes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Project&nbsp;profit&nbsp;margin<\/mtext><mo>=<\/mo><mfrac><mrow><mtext>Net&nbsp;revenue<\/mtext><mo>\u2212<\/mo><mtext>Total&nbsp;project&nbsp;costs<\/mtext><\/mrow><mtext>Net&nbsp;revenue<\/mtext><\/mfrac><mo>\u00d7<\/mo><mn>100<\/mn><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Project profit margin} =\n\\frac{\\text{Net revenue} &#8211; \\text{Total project costs}}{\\text{Net revenue}}\n\\times 100<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If an engineering project produces $160,000 in net revenue and costs $128,000 to deliver, its project profit margin is 20%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Compare margins across projects, clients, and service lines to spot where pricing, scope, staffing, or delivery assumptions may need attention. Just make sure everyone uses the same definition of project costs so you&#8217;re comparing like with like.<\/p>\n\n\n\n<h3 id=\"h-2-billable-utilization-rate\" class=\"wp-block-heading\">2. Billable utilization rate<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Billable utilization measures how much available working time is devoted to billable project work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Billable&nbsp;utilization&nbsp;rate<\/mtext><mo>=<\/mo><mfrac><mtext>Billable&nbsp;hours<\/mtext><mtext>Total&nbsp;available&nbsp;hours<\/mtext><\/mfrac><mo>\u00d7<\/mo><mn>100<\/mn><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Billable utilization rate} =\n\\frac{\\text{Billable hours}}{\\text{Total available hours}}\n\\times 100<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If an engineer records 30 billable hours during a 40-hour workweek, their billable utilization is 75%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Falling utilization across a team may point to weaker demand or poor resource allocation, while consistently high utilization can signal capacity pressure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Targets should reflect different roles, so the useful question is whether utilization supports your revenue goals without overstretching the team or crowding out management, training, and business development.<\/p>\n\n\n\n<h3 id=\"h-3-realization-rate\" class=\"wp-block-heading\">3. Realization rate<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">While utilization tells you how much time goes into billable work, realization shows how much of the value of that work actually becomes billed revenue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Realization&nbsp;rate<\/mtext><mo>=<\/mo><mfrac><mtext>Billed&nbsp;revenue<\/mtext><mtext>Value&nbsp;of&nbsp;billable&nbsp;work<\/mtext><\/mfrac><mo>\u00d7<\/mo><mn>100<\/mn><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Realization rate} =\n\\frac{\\text{Billed revenue}}{\\text{Value of billable work}}\n\\times 100<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suppose your team records work worth $100,000 at standard billing values, but only $88,000 is ultimately billed. Your realization rate would be 88%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A falling rate could point to write-downs, work outside agreed scope, inefficient delivery, or billing arrangements that don&#8217;t reflect the effort required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Look at realization alongside utilization: being busy has limited financial value if too much of that work never makes it onto the invoice.<\/p>\n\n\n\n<h3 id=\"h-4-net-multiplier\" class=\"wp-block-heading\">4. Net multiplier<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The net multiplier, sometimes called a billing multiplier, helps you assess how effectively direct labor cost is converted into net revenue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Net&nbsp;multiplier<\/mtext><mo>=<\/mo><mfrac><mtext>Net&nbsp;revenue<\/mtext><mtext>Direct&nbsp;labor&nbsp;cost<\/mtext><\/mfrac><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Net multiplier} =\n\\frac{\\text{Net revenue}}{\\text{Direct labor cost}}<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, $300,000 of net revenue divided by $100,000 in direct labor cost produces a net multiplier of 3.0.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If people remain busy but the multiplier starts to fall, look at whether billing rates, discounts, staffing mix, or the amount of labor needed to complete projects has changed. There&#8217;s no single multiplier that&#8217;s right for every firm, so judge the trend against your own cost structure, service mix, and financial goals.<\/p>\n\n\n\n<h3 id=\"h-5-project-budget-variance\" class=\"wp-block-heading\">5. Project budget variance<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Project budget variance shows how actual project costs compare with what you planned to spend. Tracking it while work is underway can give you time to respond before an overrun becomes a bigger profitability problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Project&nbsp;budget&nbsp;variance<\/mtext><mo>=<\/mo><mfrac><mrow><mtext>Actual&nbsp;cost<\/mtext><mo>\u2212<\/mo><mtext>Budgeted&nbsp;cost<\/mtext><\/mrow><mtext>Budgeted&nbsp;cost<\/mtext><\/mfrac><mo>\u00d7<\/mo><mn>100<\/mn><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Project budget variance} =\n\\frac{\\text{Actual cost} &#8211; \\text{Budgeted cost}}{\\text{Budgeted cost}}\n\\times 100<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example<\/strong>:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If a project was budgeted to cost $80,000 but actual costs rise to $88,000, it\u2019s 10% over budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The next question is why. Scope changes, underestimated labor, weak initial estimates, or delivery problems can all create variances.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Understanding the cause not only helps you manage the current project and improve how you estimate and price similar work next time.<\/p>\n\n\n\n<h3 id=\"h-6-days-sales-outstanding\" class=\"wp-block-heading\">6. Days sales outstanding<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Completing profitable work doesn\u2019t immediately put cash in the bank. You still need to invoice the client and collect the payment. Days Sales Outstanding (DSO) helps you see how quickly that&#8217;s happening.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Days&nbsp;sales&nbsp;outstanding<\/mtext><mo>=<\/mo><mfrac><mtext>Accounts&nbsp;receivable<\/mtext><mtext>Annual&nbsp;credit&nbsp;sales<\/mtext><\/mfrac><mo>\u00d7<\/mo><mn>365<\/mn><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Days sales outstanding} =\n\\frac{\\text{Accounts receivable}}{\\text{Annual credit sales}}\n\\times 365<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A rising DSO can mean more cash is sitting in receivables for longer. But don&#8217;t assume the client is always the problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Slow cash conversion can begin before an invoice is even issued, so look at unbilled work and delays between reaching billing milestones and sending invoices too.<\/p>\n\n\n\n<h3 id=\"h-7-operating-cash-flow\" class=\"wp-block-heading\">7. Operating cash flow<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Operating cash flow shows how much cash your firm generates or uses through its core business activities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A profitable project can still create cash pressure if salaries, contractors, and suppliers need paying well before the client pays you. Review operating cash flow alongside billing, receivables, payroll commitments, and a <a href=\"https:\/\/www.sage.com\/en-us\/blog\/what-is-cash-flow-forecasting\/\">cash flow forecast<\/a> to understand whether the firm can comfortably fund upcoming work and growth.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A rapidly growing backlog, for example, may look healthy but could require new hires before the associated project revenue turns into cash.<\/p>\n\n\n\n<h3 id=\"h-8-backlog\" class=\"wp-block-heading\">8. Backlog<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Backlog represents committed work your firm has won but hasn&#8217;t yet completed or recognized as revenue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If projects are winding down and backlog is falling too, utilization and revenue could weaken next. If backlog is growing faster than your delivery capacity, the challenge may be having enough people to do the work you&#8217;ve already won.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Break backlog down by expected delivery period, team, or project type to make it more useful for planning. That turns it from a headline sales figure into an input for staffing, forecasting, and cash-flow decisions.<\/p>\n\n\n\n<h3 id=\"h-9-forecast-accuracy\" class=\"wp-block-heading\">9. Forecast accuracy<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Forecast accuracy shows how closely expectations about future revenue, costs, workload, or cash match what actually happens.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are several ways to measure it, so choose a consistent method and compare forecasts with actual results over time. The aim isn&#8217;t perfection\u2014it&#8217;s to identify patterns and get better at planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If revenue forecasts are repeatedly too optimistic, your assumptions around billing or project completion may need attention. If labor forecasts are consistently understated, the issue may sit with estimating or resource planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Better forecasts give you more time to adjust before those gaps become financial problems.<\/p>\n\n\n\n<h3 id=\"h-10-revenue-per-employee\" class=\"wp-block-heading\">10. Revenue per employee<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Revenue per employee shows how much revenue your firm generates relative to the size of its workforce.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formula:<\/strong><\/p>\n\n\n\n<div class=\"wp-block-math\"><math display=\"block\"><semantics><mrow><mtext>Revenue&nbsp;per&nbsp;employee<\/mtext><mo>=<\/mo><mfrac><mtext>Total&nbsp;revenue<\/mtext><mtext>Average&nbsp;number&nbsp;of&nbsp;employees<\/mtext><\/mfrac><\/mrow><annotation encoding=\"application\/x-tex\">\\text{Revenue per employee} =\n\\frac{\\text{Total revenue}}{\\text{Average number of employees}}<\/annotation><\/semantics><\/math><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Example:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If your firm generates $6 million in annual revenue with an average workforce of 40 employees, revenue per employee would be $150,000.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What it tells you:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Treat the KPI as a trend rather than a universal benchmark. Service mix, billing rates, use of contractors, and workforce structure can all affect the result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A temporary decline may simply mean you&#8217;ve hired ahead of expected growth, so compare it with backlog, utilization, and forecasts before drawing conclusions about productivity or staffing.<\/p>\n\n\n\n<h2 id=\"h-why-should-engineering-firms-track-kpis\" class=\"wp-block-heading\">Why should engineering firms track KPIs?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering firms should track KPIs because they help explain why financial performance is changing and where action may be needed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While a profit and loss statement can tell you how your business performed during a period, project-focused KPIs connect those results to what\u2019s happening across pricing, labor, billing, delivery, and future workload.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suppose revenue is increasing but margins are falling. Revenue alone may make the period look positive, but it doesn\u2019t tell the whole story. Looking at project margin, utilization, realization, and labor costs together could reveal that projects are taking more hours than planned, work is being written down, or pricing no longer reflects the cost of delivery.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The right KPIs can help you make better financial decisions about:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Pricing and estimating:<\/strong> compare actual project economics with assumptions used when work was priced and use those lessons to improve future bids.<\/li>\n\n\n\n<li><strong>Resource planning:<\/strong> identify whether capacity is constrained, underused, or poorly matched to the work in your pipeline.<\/li>\n\n\n\n<li><strong>Project control:<\/strong> spot cost, labor, scope, or billing issues while there is still time to respond.<\/li>\n\n\n\n<li><strong>Cash management:<\/strong> understand how quickly completed work moves from delivery to invoicing and, ultimately, cash.<\/li>\n\n\n\n<li><strong>Forecasting and growth:<\/strong> compare backlog and forecasts with the people and financial resources available to deliver the work before making hiring or investment decisions.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The value comes from using these measures together, rather than treating each KPI as an isolated score. An engineering KPI dashboard should help you understand what\u2019s changing, why it\u2019s changing, and which decision needs your attention next.<\/p>\n\n\n<section class=\"wp-block-sage-how-to\">\n\t\n<h2 id=\"h-how-should-engineering-firms-choose-the-right-kpis\" class=\"wp-block-heading\">How should engineering firms choose the right KPIs?<\/h2>\n\t\n<p class=\"wp-block-paragraph\">The right engineering KPIs are the ones that help you make better financial and operational decisions. Rather than tracking every available metric, focus on a manageable group that reflects your priorities and helps you understand what\u2019s driving performance.<\/p>\n\t\t\t<ol class=\"how-to-steps\">\n\t\t\t<li class=\"wp-block-sage-how-to-step\" id=\"how-to-step-9c902fd8\">\n\t<h3 id=\"h-tie-kpis-to-financial-and-business-goals\" class=\"wp-block-heading\">Tie KPIs to financial and business goals<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Start with the decisions your firm needs to make more confidently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If project profitability is inconsistent, for example, you might prioritize project profit margin, budget variance, realization, and net multiplier. If growth is creating staffing uncertainty, utilization, backlog, revenue per employee, and forecast accuracy may deserve more attention.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The aim is to work backwards from the business question\u2014not forwards from whatever data happens to be available. As priorities change, the KPIs you focus on may need to change too.<\/p><\/li>\n<li class=\"wp-block-sage-how-to-step\" id=\"how-to-step-531ebeaa\">\n\t<h3 id=\"h-use-a-mix-of-leading-and-lagging-indicators\" class=\"wp-block-heading\">Use a mix of leading and lagging indicators<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Balance KPIs that tell you what has already happened with measures that can give you an early signal of what may happen next.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, project margin can tell you how profitability has performed, while backlog, utilization, and forecasts can help you judge whether current workload and capacity are likely to support future results. Looking at both gives you more context before you act on a single number.<\/p><\/li>\n<li class=\"wp-block-sage-how-to-step\" id=\"how-to-step-f1a483c3\">\n\t<h3 id=\"h-set-consistent-definitions-formulas-and-targets\" class=\"wp-block-heading\">Set consistent definitions, formulas, and targets<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Document exactly how each KPI is calculated before comparing results across projects, teams, or reporting periods.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Agree on what counts as available time, which costs belong to a project, how net revenue is defined, and when work enters backlog. If different teams calculate the same KPI differently, the comparison quickly becomes meaningless.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Apply the same care to targets. Use your own historical performance, business model, project mix, and financial goals as the starting point, with external benchmarks providing context rather than a universal standard.<\/p><\/li>\n\t\t<\/ol>\n\t<\/section>\n\n\n\n<h2 id=\"h-how-can-engineering-firms-track-and-report-kpis-effectively\" class=\"wp-block-heading\">How can engineering firms track and report KPIs effectively?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Effective KPI tracking depends on having reliable data, presenting it in a form people can act on, and reviewing it frequently enough to identify meaningful changes. For engineering firms, that usually means connecting project and financial information rather than calculating KPIs from separate systems and spreadsheets.<\/p>\n\n\n\n<h3 id=\"h-bring-accounting-and-project-data-together\" class=\"wp-block-heading\">Bring accounting and project data together<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A KPI is only as dependable as the information underneath it. Many engineering KPIs draw on data from different parts of the business, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Accounting and general ledger data<\/strong> for revenue, costs, cash flow, and receivables.<\/li>\n\n\n\n<li><strong>Project data<\/strong> for budgets, actual costs, scope, and delivery progress.<\/li>\n\n\n\n<li><strong>Time and expense data<\/strong> for utilization, labor costs, and project profitability.<\/li>\n\n\n\n<li><strong>Billing data<\/strong> for realization, invoicing, and DSO.<\/li>\n\n\n\n<li><strong>Resource and forecast data<\/strong> for capacity, backlog, and future workload.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">When those records sit in separate systems or spreadsheets, teams can spend more time reconciling numbers than interpreting them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Connecting the data gives finance and project leaders a more consistent view of performance and reduces the risk of different teams working from different figures for the same KPI.<\/p>\n\n\n\n<h3 id=\"h-use-engineering-kpi-dashboards-for-real-time-visibility\" class=\"wp-block-heading\">Use engineering KPI dashboards for real-time visibility<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">An engineering KPI dashboard should bring related measures together so you can see the story behind the numbers, rather than simply displaying every metric available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Useful combinations might include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Utilization + project margin:<\/strong> are busy teams also delivering profitable work?<\/li>\n\n\n\n<li><strong>DSO + operating cash flow:<\/strong> are billing or collection delays putting pressure on cash?<\/li>\n\n\n\n<li><strong>Backlog + utilization + forecasts:<\/strong> do you have enough capacity to deliver upcoming work?<\/li>\n\n\n\n<li><strong>Budget versus actuals + project margin:<\/strong> are overruns starting to erode profitability?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Different audiences may need different views. Project managers might focus on budget versus actuals, time, billing, and project margin, while finance leaders may need a broader view of profitability, receivables, cash flow, backlog, and forecasts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The goal is a dashboard that helps someone make a decision\u2014not one that simply proves the data exists.<\/p>\n\n\n\n<h3 id=\"h-review-kpis-regularly-and-investigate-variances\" class=\"wp-block-heading\">Review KPIs regularly and investigate variances<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Review frequency should match how quickly the KPI can change and how quickly you can act on it.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>During active projects:<\/strong> monitor time, budgets, utilization, billing, and project margin frequently enough to catch problems early.<\/li>\n\n\n\n<li><strong>Monthly or quarterly: <\/strong>review broader measures such as DSO, cash flow, backlog, forecasts, and revenue per employee.<\/li>\n\n\n\n<li><strong>When something moves unexpectedly:<\/strong> investigate the cause rather than treating the variance itself as the answer.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For example, if project margin falls, ask whether hours exceeded the estimate, a phase was underpriced, more senior labor was needed than planned, or additional work fell outside the agreed scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The same principle applies elsewhere. Rising DSO could stem from slow-paying clients or slow invoicing, while falling utilization might reflect weaker demand, resource allocation problems, or changing responsibilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The point of KPI reporting is to move from \u201cwhat happened?\u201d to \u201cwhy did it happen, and what should we do next?\u201d<\/p>\n\n\n\n<h2 id=\"h-how-can-accounting-software-improve-engineering-kpi-tracking\" class=\"wp-block-heading\">How can accounting software improve engineering KPI tracking?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Accounting and <a href=\"https:\/\/www.sage.com\/en-us\/accounting-software\/project-costing\/\">project cost management software<\/a> can improve engineering KPI tracking by bringing financial and project data together, reducing manual reporting, and giving teams a more consistent view of performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For engineering firms, that can make it easier to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Track project costs and profitability:<\/strong> compare revenue, labor, expenses, and other project costs to understand which projects are performing as expected.<\/li>\n\n\n\n<li><strong>Capture time and expenses accurately:<\/strong> give utilization, realization, project costing, and billing calculations a more reliable data foundation.<\/li>\n\n\n\n<li><strong>Monitor budgets against actuals:<\/strong> see where project costs or hours are moving away from plan while there\u2019s still time to respond.<\/li>\n\n\n\n<li><strong>Manage billing and receivables:<\/strong> follow work from delivery through invoicing and collection, helping you monitor realization, DSO, and cash flow.<\/li>\n\n\n\n<li><strong>Build dashboards and reports:<\/strong> bring related KPIs together so finance leaders, project managers, and business owners can focus on the measures most relevant to their decisions.<\/li>\n\n\n\n<li><strong>Improve forecasting:<\/strong> combine historical financial results with current project, backlog, and resource information to build a clearer view of future revenue, workload, and cash needs.<\/li>\n<\/ul>\n\n\n\n<h3 id=\"h-use-connected-reporting-to-move-from-measurement-to-action\" class=\"wp-block-heading\">Use connected reporting to move from measurement to action<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The real value comes from seeing these measures together. A project manager can compare budgets with actual costs while work is underway, for example, while finance can look at project margin alongside billing, receivables, and cash flow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sage Intacct <a href=\"https:\/\/www.sage.com\/en-us\/industry\/services\/engineering-firms\/\">accounting software for engineering firms<\/a> connects project and financial information to support budgeting, time and expense tracking, project costing, billing, and reporting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Its <a href=\"https:\/\/www.sage.com\/en-us\/sage-business-cloud\/intacct\/product-capabilities\/extended-capabilities\/project-costing\/\">project costing and billing<\/a> can help bring costs, time, revenue, and budget-versus-actual information into shared reports and dashboards, reducing the need for manual reconciliation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That gives engineering teams more time to interpret what their KPIs are telling them\u2014and act on changes in profitability, capacity, cash flow, or project performance sooner.<\/p>\n\n\n<section class=\"wp-block-sage-faq\">\n\t\n<h2 id=\"h-frequently-asked-questions-about-engineering-kpis\" class=\"wp-block-heading\">Frequently asked questions about engineering KPIs<\/h2>\n\t\t\t<div class=\"faq-items\">\n\t\t\t<div class=\"wp-block-sage-faq-item\" id=\"faq-item-1b0e16dd\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-what-s-a-good-utilization-rate-for-engineering-firms\" class=\"wp-block-heading\">What&#8217;s a good utilization rate for engineering firms?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">There\u2019s no single utilization rate that works for every engineering firm. The right target depends on the employee\u2019s role, your service model, the amount of non-billable work required, and your financial goals.<\/p>\n\n<p class=\"wp-block-paragraph\">A project-focused technical specialist may be expected to spend more time on billable work than a principal responsible for business development, management, and mentoring. Rather than chasing a universal benchmark, compare utilization by role and over time, then investigate meaningful changes alongside backlog, margins, and workload.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-90c89e9c\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-is-a-higher-net-multiplier-always-better\" class=\"wp-block-heading\">Is a higher net multiplier always better?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">Not necessarily. A higher net multiplier can indicate stronger pricing or more efficient use of labor, but the number needs context.<\/p>\n\n<p class=\"wp-block-paragraph\">For example, a rising multiplier paired with healthy project margins and sustainable utilization may be positive. If it rises while teams are overstretched or project delivery begins to suffer, the improvement may not be sustainable. Look at net multiplier alongside utilization, realization, and project margin before drawing conclusions.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-b42990b7\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-what-causes-engineering-kpis-to-conflict-with-each-other\" class=\"wp-block-heading\">What causes engineering KPIs to conflict with each other?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">Engineering KPIs can appear to conflict because each one measures a different part of performance. That tension can actually help you understand what\u2019s happening beneath the headline numbers.<\/p>\n\n<p class=\"wp-block-paragraph\">High utilization combined with falling realization, for example, could mean teams are busy but too much work is being written down or not billed. Growing backlog with consistently high utilization could point to future capacity pressure. When KPIs move in different directions, investigate the relationship between them rather than assuming one measure is wrong.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-dd989162\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-how-many-kpis-should-an-engineering-firm-track\" class=\"wp-block-heading\">How many KPIs should an engineering firm track?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">There\u2019s no fixed number, but a focused set of KPIs tied to your most important business decisions is usually more useful than tracking every metric available.<\/p>\n\n<p class=\"wp-block-paragraph\">Start with the areas that matter most to your firm\u2014such as profitability, capacity, cash flow, or growth\u2014and choose a small group of measures that gives you both current results and forward-looking signals. You can then change the mix as your priorities evolve.<\/p>\n\t\t<\/div>\n\t<\/div>\n<div class=\"wp-block-sage-faq-item\" id=\"faq-item-82aaf692\">\n\t<div class=\"faq-item-question\">\n\t\t\n<h3 id=\"h-should-project-managers-and-finance-teams-track-the-same-kpis\" class=\"wp-block-heading\">Should project managers and finance teams track the same KPIs?<\/h3>\n\t<\/div>\n\t\t\t<div class=\"faq-item-answer\">\n\t\t\t\n<p class=\"wp-block-paragraph\">They should work from the same underlying data, but they may need different views of it. Project managers are more likely to focus on project budgets, actual costs, time, utilization, billing, and margin while work is underway.<\/p>\n\n<p class=\"wp-block-paragraph\">Finance leaders may need a broader view that combines those measures with receivables, cash flow, backlog, forecasts, and firm-level profitability. A shared data foundation keeps the numbers consistent while allowing each team to focus on the decisions it owns.<\/p>\n\t\t<\/div>\n\t<\/div>\n\t\t<\/div>\n\t<\/section>\n\n\n\n<div class=\"single-cta\">\n\t<div class=\"single-cta__positioner on-scroll-highlight__target\">\n\t\t<div class=\"single-cta__wrapper has-dark-background-color\">\n\t\t\t<div class=\"single-cta__content\">\n\t\t\t\t\t\t\t\t<h2 class=\"single-cta__title h3\">Get business and financial management advice in your inbox<\/h2>\n\n\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<a\n\t\t\t\t\t\thref=\"#gate-ab515c6e-7e90-4c2f-a67e-113872516e8b\"\n\t\t\t\t\t\tclass=\"single-cta__button button button--primary\"\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t>Subscribe to the Sage Advice newsletter<\/a>\n\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<\/div>\n\n\t\t\t\t\t<img decoding=\"async\" width=\"1064\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2019\/03\/GettyImages-119014875-1064x810.jpg\" class=\"single-cta__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2019\/03\/GettyImages-119014875-1064x810.jpg 1064w\" sizes=\"auto, (min-width: 48em) 33vw, 100vw\" \/>\t\t\t<\/div>\n<\/div>\n\n\n<section class=\"more-topics alignfull has-grey-light-background-color wp-block-sage-post-topics\">\n\t<div class=\"container\">\n\t\t<div class=\"row\">\n\t\t\t<div class=\"col col-12 col-lg-4\">\n\t\t\t\t<h3 class=\"more-topics__title h2\">Browse more topics from this article<\/h3>\n\t\t\t<\/div>\n\t\t\t<div class=\"col col-12 col-lg-8\">\n\t\t\t\t<ul class=\"post-tags__list\">\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/construction\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tConstruction\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t\t\t<li class=\"post-tags__item\">\n\t\t\t\t\t\t\t<a href=\"https:\/\/www.sage.com\/en-us\/blog\/hub\/manufacturing\/\" class=\"post-tags__link button button--secondary\">\n\t\t\t\t\t\t\t\tManufacturing\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t\t<\/ul>\n\t\t\t<\/div>\n\t\t<\/div>\n\t<\/div>\n<\/section>\n\n\n<div class=\"alignfull wp-block-sage-related-posts\">\n\t<section class=\"related-posts card-grid has-dark-background-color\">\n\t<div class=\"container\">\n\t\t\t\t\t<div class=\"row\">\n\t\t\t\t<div class=\"col\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--featured h1\">Explore more wisdom<\/h2>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\n\t\t\t<div class=\"row related-posts__featured\">\n\t\t\t\t<div class=\"col card-grid__item\">\n\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-0 post-38011 post type-post status-publish format-standard has-post-thumbnail hentry category-strategy-legal-operations tag-boss-your-business tag-construction tag-productivity business_type-small-business business_type-growing-business industry-manufacturing industry-professional-services card-post--is-clickable\"\n>\n\t<div class=\"card-post__media-wrapper\">\n\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"1215\" height=\"810\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-475355864-1215x810.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-475355864-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-475355864-768x512.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2023\/09\/GettyImages-475355864-1215x810.jpg 1215w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\t<\/div>\n\n\t<div class=\"card-post__content\">\n\t\t\t\t\t<div class=\"card-post__label\">Recommended<\/div>\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-25T11:49:21-04:00\">September 25, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">19 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h3\">\n\t\t\t\t\t\t\t<a\n\t\t\t\t\tclass=\"card-post__title-link\"\n\t\t\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/engineering-resource-planning\/\"\n\t\t\t\t>\n\t\t\t\n\t\t\tEngineering resource planning: A guide to capacity and profitability\n\t\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/p>\n\n\t\t\n\t\t\t\t\t<p class=\"card-post__description\">\n\t\t\t\tEngineering resource planning helps architecture and engineering firms align project demand with the right staffing. Learn how to connect resource decisions with project budgets, utilization, margins, and financial performance to support more profitable growth.\t\t\t<\/p>\n\t\t\n\t\t\t<\/div>\n\n\t<\/article>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n\t\t\n\t\t\t\t\t<div class=\"row related-posts__non-featured\">\n\t\t\t\t<div class=\"col col-12\">\n\t\t\t\t\t<h2 class=\"related-posts__heading related-posts__heading--more h4\">More on this Topic<\/h2>\n\t\t\t\t<\/div>\n\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-1 post-10296 post type-post status-publish format-standard has-post-thumbnail hentry category-money-matters category-people-leadership category-strategy-legal-operations tag-accountants tag-business-strategy tag-cfo-3-0 tag-cloud-financial-management tag-construction tag-project-management business_type-growing-business industry-construction-and-real-estate industry-financial-services industry-professional-services industry-software-saas industry-technology\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/project-profitability\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0320-684x384.jpeg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0320-684x384.jpeg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0320-768x512.jpeg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0320-1214x810.jpeg 1214w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-25T09:17:00-04:00\">September 25, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">10 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tProject profitability: How to calculate, analyze, and improve margins\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-2 post-37912 post type-post status-publish format-standard has-post-thumbnail hentry category-construction tag-construction tag-construction-hiring-retention tag-project-management tag-growing-a-business tag-hr-payroll tag-hr-software business_type-small-business business_type-growing-business industry-construction-and-real-estate\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/introducing-sage-hcm-for-construction\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0861-684x384.jpeg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0861-684x384.jpeg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0861-768x512.jpeg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0861-1214x810.jpeg 1214w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-09-23T04:08:21-04:00\">September 23, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">5 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tIntroducing Sage HCM for Construction: Connecting workforce and financial data for smarter operations\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-3 post-32603 post type-post status-publish format-standard has-post-thumbnail hentry category-money-matters category-people-leadership tag-cloud-financial-management tag-cloud-technology tag-distribution tag-manufacturing tag-sage-x3 tag-technology business_type-growing-business industry-distribution industry-manufacturing\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/how-to-reduce-distribution-costs\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-594203315-684x384.jpg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-594203315-684x384.jpg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-594203315-768x432.jpg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2022\/04\/GettyImages-594203315-1440x810.jpg 1440w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-07-29T12:25:21-04:00\">July 29, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">11 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tHow to reduce distribution costs and optimize profitability\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\n\t\t\t\t\t<div class=\"col col-6 col-lg-3 card-grid__item\">\n\t\t\t\t\t\t<article\n\t\tclass=\"card-post related-post related-post-4 post-36506 post type-post status-publish format-standard has-post-thumbnail hentry category-construction category-money-matters tag-accounting-101 tag-construction tag-construction-financial-management tag-construction-it tag-growing-a-business tag-staying-competitive business_type-small-business business_type-growing-business industry-construction-and-real-estate\"\n>\n\t\t\t<a\n\t\t\tclass=\"card-post__link\"\n\t\t\thref=\"https:\/\/www.sage.com\/en-us\/blog\/property-management-guide\/\"\n\t\t\t\t\t>\n\t\t\t<figure class=\"card-post__media\">\n\t\t\t\t\t\t\t<img decoding=\"async\" width=\"684\" height=\"384\" src=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0503-684x384.jpeg\" class=\"card-post__image\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0503-684x384.jpeg 684w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0503-768x512.jpeg 768w, https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2025\/08\/Mar2025_Construction-Commerical_0503-1214x810.jpeg 1214w\" sizes=\"auto, (min-width: 48em) 250px, (min-width: 30em) 100vw, 100vw\" \/>\t\t\t\n\t\t\t\n\t\t\t\t\t<\/figure>\n\n\t\t\n\t\t\t\t\t<div class=\"card-post__meta\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"posted-on \"><time class=\"entry-date published\" datetime=\"2026-05-11T06:24:40-04:00\">May 11, 2026<\/time><\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<span class=\"card-post__meta-text\"><span class=\"reading-time\">12 min read<\/span><\/span>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\n\t\t<p class=\"card-post__title h5\">\n\t\t\tProperty management accounting basics and best practices\t\t<\/p>\n\n\t\t\t<\/a>\n\t\n\t\n\t\t\n\t\n\t<\/article>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t\t<\/div>\n<\/section>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Engineering KPIs help teams connect project activity to financial performance, improve profitability and cash flow, strengthen forecasting, and make better pricing, staffing, and growth decisions. <\/p>\n","protected":false},"author":1910,"featured_media":25625,"menu_order":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_is_cornerstone":"","_yoast_wpseo_meta-robots-noindex":"","_yoast_wpseo_meta-robots-nofollow":"","_yoast_wpseo_opengraph-title":"","_yoast_wpseo_opengraph-description":"","_yoast_wpseo_opengraph-image":"","_yoast_wpseo_opengraph-image-id":"","_yoast_wpseo_twitter-title":"","_yoast_wpseo_twitter-description":"","_yoast_wpseo_twitter-image":"","_yoast_wpseo_twitter-image-id":"","_yoast_wpseo_schema_page_type":"","_yoast_wpseo_schema_article_type":"","_sage_video":false,"_yoast_wpseo_focuskeywords":"","_yoast_wpseo_keywordsynonyms":"","_yoast_wpseo_primary_category":"43","sage_membership_post_content_type":"","sage_membership_post_featured_video_id":"","sage_membership_post_video_type":"","sage_membership_post_featured_video_duration":"","post_featured_image_hide":false,"sage_hide_published_date":false,"sage_hide_read_time":false,"sage_hide_share_buttons":false,"_pwl_sage_podcast_buzzsprout_src":"","footnotes":""},"categories":[43,44],"tags":[192,251],"business_type":[40,41],"lilypad":[],"context":[],"industry":[94,55],"persona":[],"imagine_tag":[],"coauthors":[1059],"class_list":["post-37999","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-money-matters","category-strategy-legal-operations","tag-construction","tag-manufacturing","business_type-small-business","business_type-growing-business","industry-distribution","industry-professional-services"],"sage_meta":{"region":"en-us","author_name":"Laura Slingo","featured_image":"https:\/\/www.sage.com\/en-us\/blog\/wp-content\/uploads\/sites\/2\/2024\/10\/BrandShoot-LND_June2024_Discrete-Mfg-Metal-Fabrication_0669.jpg","imagine_tags":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Sage Advice US","distributor_original_site_url":"https:\/\/www.sage.com\/en-us\/blog","push-errors":false,"_links":{"self":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/37999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/users\/1910"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/comments?post=37999"}],"version-history":[{"count":4,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/37999\/revisions"}],"predecessor-version":[{"id":38003,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/posts\/37999\/revisions\/38003"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media\/25625"}],"wp:attachment":[{"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/media?parent=37999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/categories?post=37999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/tags?post=37999"},{"taxonomy":"business_type","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/business_type?post=37999"},{"taxonomy":"lilypad","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/lilypad?post=37999"},{"taxonomy":"context","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/context?post=37999"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/industry?post=37999"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/persona?post=37999"},{"taxonomy":"imagine_tag","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/imagine_tag?post=37999"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.sage.com\/en-us\/blog\/api\/wp\/v2\/coauthors?post=37999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}